mr
.
steam
®
C U S E R I E S
Installation, Operating & Maintenance Manual
3
BEFORE INSTALLING
IMPORTANT:
TTaakkee ttiim
mee ttoo rreeaadd tthheessee iinnssttrruuccttiioonnss tthhoorroouugghhllyy bbeeffoorree iinnssttaalllliinngg oorr sseerrvviicciinngg..
A
Alltthhoouugghh tthhiiss C
CU
U SStteeaam
mbbaatthh G
Geenneerraattoorr hhaass bbeeeenn qquuaalliiffiieedd ffoorr sshhiippm
meenntt bbyy M
Mrr.. SStteeaam
m,, tthhee
ffoolllloow
wiinngg m
muusstt bbee rreevviieew
weedd ffoorr pprrooppeerr aanndd ssaaffee uussee..
IMPORTANT:
C
CU
U G
Geenneerraattoorrss aarree ddeessiiggnneedd ffoorr ccoom
mm
meerrcciiaall aapppplliiccaattiioonnss tthhaatt rreeqquuiirree ccoonnttiinnuuoouuss
oorr nneeaarr ccoonnttiinnuuoouuss uussee.. C
CU
U G
Geenneerraattoorrss aarree nnoott ssuuiittaabbllee ffoorr iinnssttaallllaattiioonnss w
wiitthh iinntteerrm
miitttteenntt ooppeerraattiioonn
w
weerree tthhee ggeenneerraattoorr rreem
maaiinnss uunnuusseedd ffoorr eexxtteennddeedd ppeerriiooddss ooff ttiim
mee.. C
Coonnssuulltt M
MrrSStteeaam
m bbeeffoorree ssppeecciiffyyiinngg
aa sstteeaam
m ggeenneerraattoorr ttoo ddeetteerrm
miinnee tthhee ooppttiim
maall sstteeaam
m ggeenneerraattoorr ffoorr yyoouurr aapppplliiccaattiioonn
1. Verify that the model and accessories are as specified and
ordered.
2. Verify that the power voltage and control voltage at the
site is suitable for the CU Steambath Generator.
3. Verify the correct steam generator sizing by referring to
the Mr. Steam sizing guide. See page 5.
4. DO NOT use black iron pipe or galvanized pipe for the
steam line. Use brass pipe or copper tubing ONLY, and
in accordance with National and local plumbing Codes.
5. The physical size of the unit, clearance for plumbing
servicing and its distance from the steam room must all
be considered before selecting a location for the generator.
See pages 3 & 4.
6. The Manufacturer's Data Report is supplied with the gen-
erator. This is an important document and may be
required by a State or Provincial Agency. THIS DOCU-
MENT MUST BE SECURED IN A SAFE LOCATION.
7. Do not use or install unauthorized components, acces-
sories or products on the generator or generator piping.
IMPORTANT:
The Mr. Steam Digital 1 System operating
and over temperature control is to be installed in accor-
dance with the specific instructions provided. See Note 7
below.
STEAM ROOM GUIDELINES
IMPORTANT:
The following general information should be
used in conjunction with your architect, designer and contrac-
tor in determining all factors necessary in providing a suitable
and safe steam room environment for your bathers.
IMPORTANT:
Owners/operators should obtain a copy and
familiarize themselves with the latest edition of the American
College Sports Medicine Health/Fitness Faculty Standards
and Guidelines, or a similar resource and reference publica-
tion, and refer to those guidelines for the proper and safe
operation of a spa facility including steam rooms.
Steam room construction information is available from the Tile
Council of America, Inc. at (864) 646-8453 or www.tileusa.com
1. Steam room must be completely enclosed, with full walls,
door, floor and ceiling.
2. It is recommended that a gasketed door be used for heat
sealing and steam containment. Windows, skylights and the
like that are part of the steam room should be double
paned. Only vapor sealed fixtures approved for the appli-
cation should be used.
3.
If tile or other smooth surface is used for
the flooring, provide suitable anti-skid strips or equivalent,
to prevent user slipping and injury.
IMPORTANT:
4. Walls and ceilings must be constructed with water-resistant,
non-corrosive surface, such as tile, marble, molded acrylic,
or other non-porous material. The ceiling should be sloped
to prevent dripping of condensate on bathers. If acrylic,
fiberglass or other non-heat resistant- materials are used as
part of the steam room enclosure, see page 7, “Steamhead”
and “Acrylic Shield” for important additional details.
5. Provide floor drains for condensate run-off and steam room
cleaning.
6. Comply with all applicable National and local building
and electrical Codes and confer with design consultants
and contractors for room construction details.
7. The Digital 1 Temperature Control System is
required operating equipment for each steam room. The
operating temperature control is to be set by the
owner/operator to sense desired room temperature at the
sensor location within the steam room. Connection of the
Digital 1 Over Temperature cut-off is mandatory to provide
additional protection to the bathers. The steam room is to
be operated in accordance with “Important” ºinformation
as noted above.
IMPORTANT:
Final selection of the steam room temperature
setting is at the discretion of the owner/operator.
CAUTION
!
CAUTION
!