Summary of Contents for CT12E

Page 1: ...mr steam club therapy Club Therapy Steambath Generator Systems Installation Operation Maintenance Manual Models CT 6E CT 9E CT 12E...

Page 2: ...mbing Water Supply Drain Steam Outlet Safety Valve Drain Pan AromaSteam 5 Steam Head Installation 6 Generator Dimensions 7 Electrical Specifications Field Power Wiring 8 Wiring Diagrams 9 10 Initial S...

Page 3: ...h the steam head and avoid the steam near the steam head C Prolonged use of the steam system can raise excessively the internal human body temperature and impair the body s ability to regulate its int...

Page 4: ...isclaims responsibility for the sizing of a model selected IMPORTANT For steam rooms constructed of acrylic or synthetic materials select next lower rated CT model WARNING In considering a purchase of...

Page 5: ...dripping of condensate If acrylic fiberglass or other non heat resistant materials are used as part of the steam room enclosure Consult with the material manufac ture and see pg 6 Steamhead for additi...

Page 6: ...with bathers NOTE FOR ILLUSTRATIVE PURPOSES ONLY Consult with qualified designer architect or contractor for steam room construction details Provide unions as required to facilitate installation and d...

Page 7: ...AutoFlush valve automatically will open and drain the generator Steam Outlet 1 2 NPT 1 Do not install any valve in steam line Flow of steam must be unobstructed 2 Use 1 2 inch brass pipe or copper tub...

Page 8: ...rary nipple 6 or longer in the drop ear fitting to locate the steamhead after the wall is finished STEP 4 After the wall has been finished mark on the nipple where the surface of the wall is Remove th...

Page 9: ...nal AutoFlush 2 All units in inches MM Water Inlet Control Accessory Connections Steam Outlet Safety Valve AutoFlush Manual Drain Valve IMPORTANT NOTE Provide a minimum of 12 inches at both ends and t...

Page 10: ...bly sized equipment grounding wire to ground termi nal provided 4 Install a separate circuit breaker between supply and unit Provide a power supply disconnect within sight of the steam generator or on...

Page 11: ...ARD CONTACTOR HEATING ELEMENT TO PROBE AUTOFLUSH CT STEAMSTOP ET PLUS CONTROL TRANSFORMER POWER INPUT L1 L2 FUSES GROUND WATER FEED SOLENOID VALVE EXPRESS STEAM THERMOSTAT HEATER FACTORY WIRING FIELD...

Page 12: ...LUS CT STEAM STOP and MSTS WARNING CAUTION mr steam clubtherapy Installation Operation Maintenance Manual ______________________________________________________________________________ FACTORY WIRING...

Page 13: ...into a steam enclosure or any location where accidental contact with drain water may occur In the event of a power failure the AutoFlush System valve will open and may discharge boiling water Sweat F...

Page 14: ...n there is 208 240 Volt incoming power connected 24 Volt transformer secondary output and on board 5 Volt DC control power are present _________________________________________________________________...

Page 15: ...s not related to component identification Models CT12E shown with cover removed NOTE FOR ILLUSTRATIVE PURPOSES ONLY Some components may be omitted or altered for clarity Do not use for wiring repair o...

Page 16: ...pole All 3 Phase models 103453 Contactor 50A 4 pole CT12E 100471 2 Probe Assembly All models 99096MS Heating Element Gasket All models 103938 Acrylic Shield All Models 99314 Power Fuse 60A 250V CT12E...

Page 17: ...sired steambathing temperatures Do not locate the control above or near the steam head or direct steam emissions Failure to install according to instruc tions will result in an inoperative control and...

Page 18: ...steam head or direct steam emissions IMPORTANT See installation instructions for the MSTS Temperature Probe before rough in or installation of control pgs 19 20 Step 2 Make a one inch diameter hole i...

Page 19: ...ICONE TO ANY OTHER PARTS OF THE CONTROL INCLUDING THE ADHESIVE GASKET Step 7 Insure the mounting surface is clean and dry as required for good adhesion Apply silicone into the hole in the wall as requ...

Page 20: ...EP 3 Diagram 4 Remove and discard the peel off paper from the switch housing to expose the adhesive as shown in Diagram 4 STEP 4 Diagram 5 Apply silicone provided with eTEMPO PLUS control to the hole...

Page 21: ...atures Do not locate the MSTS above or near the steam head or direct steam emissions The probe has an integral 60 cable Insure that the probe and or steam generator are located accordingly 2 Drill a 5...

Page 22: ...xposed as shown below Insure a minimum of 1 4 of the temperature bulb is exposed to the air Failure to do so may result in an inopera tive control and a hazardous condition The exposed area of the tem...

Page 23: ...the control is turned ON The duration required for the steam room to reach steambathing temperatures depends on the steam room construction and steam generator specifications Steam may continue to flo...

Page 24: ...20 minutes and 110 F will be used the next time the control is turned on If the control times out not manually turned off then the previous user time and temperature settings will be used when the ste...

Page 25: ...uge strength and suitability Limit to a maximum of a few drops for a steambathing session The bather should exit the steambath IMMEDIATELY if dizziness occurs If skin irritation occurs stop using the...

Page 26: ...O Plus controls according to installation instructions Failure to install according to instructions will result in an inoperative control or hazardous overheating or inadequate heating of the steam ro...

Page 27: ...LUB THERAPY eTEMPO eTEMPO PLUS FROM BATHROOM TO SPA MAKING WELLNESS A WAY OF LIFE MUSICTHERAPY STEAM HOME STEAM ON DEMAND STEAMTHERAPY and SUSSMAN are registered trademarks of Sussman Automatic Corpor...