background image

9

Operating Instructions and Owner’s Manual

Grand Teton Wood Pellet Fire Stove

CONNECTOR REQUIREMENTS AND ASSEMBLY

 CAUTION: A CHIMNEY CONNECTOR SHALL 

NOT PASS THROUGH AN ATTIC OR ROOF 
SPACE, CLOSET OR SIMILAR CONCEALED 
SPACE, OR A FLOOR, OR CEILING. WHERE 
PASSAGE THROUGH A WALL, OR PARTITION 
OF COMBUSTIBLE CONSTRUCTION 
IS DESIRED, THE INSTALLATION 
SHALL CONFORM TO CAN/CSA-B365, 
INSTALLATION CODE FOR SOLID-FUEL-
BURNING APPLIANCES AND EQUIPMENT

Any connector pipes or elbows should be installed with 
the crimped end on the stove end of the path (not the 
chimney cap end) and should be secured with three 
evenly spaced sheet metal screws.
Connectors, elbows, and chimneys should be type 

‘L’ or ‘PL’ and have a 80mm, or 3 inch diameter as 

the flue system is based on negative pressure in the 
combustion chamber and a slight overpressure on the 
flue gas outlet. It is therefore important that the flue 
gas connection is fitted correctly and is airtight.
It is recommended that connectors, elbows, and 
chimneys be at least 24 gauge, double walled, type B 
ventilation.
Note that bends in the exhaust path restricts air flow, 
reducing performance and provides a collection point 
for ash deposits requiring more frequent cleaning.

 CAUTION: THE JOINTS OF ANY AND ALL 

CONNECTIONS FOR ANY VENTILATION 
SYSTEMS (COMBUSTION EXHAUST 
AND OPTIONAL INLET AIR DUCT) MUST 
BE SEALED WITH HIGH TEMPERATURE 
SILICONE.

GENERAL VENTING REQUIREMENTS

 CAUTION: DO NOT CONNECT TO ANY AIR 

DISTRIBUTION DUCT OR SYSTEM.

 CAUTION: DO NOT CONNECT THIS UNIT 

TO A CHIMNEY FLUE SERVING ANOTHER 
APPLIANCE.

 CAUTION: DO NOT INSTALL A FLUE DAMPER 

IN THE EXHAUST VENTING SYSTEM OF THIS 
WOOD PELLET FIRED STOVE.

This wood pellet fire stove must be connected to either 
of the following: 

• 

Class A listed chimney complying with the 
requirements for Type HT chimneys in the Standard 
for Chimneys, Factory-Built, Residential Type and 
Building Heating Appliance, UL 103. 

• 

A International Conference of Building Officials 
(ICBO) standards for solid fuel Stoves code-
approved masonry chimney.

VENT TERMINATION

• 

Install exhaust vent at clearances specified by the 

vent manufacturer.

• 

Install exhaust vent terminations at clearances 

specified by the vent manufacturer.

• 

If using the air intake kit, ensure that there is at 

least 12 inches clearance between the exhaust vent 

termination and the intake air inlet. 

• It is recommended to keep at least 12” (30.5 cm) 

of clearance between any vent termination and 

windows, doors, or outside corners.

• 

Use silicone to create an effective vapor barrier at 

the location where the chimney or other component 

penetrates to the exterior of the structure.

• 

For additional requirements check local codes.

Any vertically terminated chimney systems must meet 

the following minimum requirements:

• 

Must be at least 15 feet (4.6 m) tall, measured from 

the top of the stove to the tip of the chimney cap.

• 

Must be at least 3 feet above the roof, measured 

from the highest point of contact with the roof and 

the tip of the chimney cap.

• 

Must be at least 2 feet (61 cm) above the highest 

point of the slope of the roof within 10 feet (305 

cm) horizontally.

Any horizontally terminated chimney systems must 

meet the following minimum requirements:

• Must have at least 12” (30.5 cm) clearance above 

grade, veranda porch, deck or balcony (Including 
vegetation and mulch).

PASSING THROUGH A WALL

Where passage through a wall or partition of 
combustible construction is desired, the installation 

shall conform to chimney manufacturer’s instructions.

NOTE: In Canada, installation must conform to 
CAN/CSA-B365 when passing through combustible 
construction, illustrated in figure 

.

Hole with a minimum 

clearance of 18” (450 

mm) between 

connector and wall

1” (25mm) clearance

Stove connector pipe

Non-combustible cover, one 

side only. If two covers are 

used, each must be mounted 

on non-combustible spacers 

at least 7/8” (21mm) away 

from the wall.

Figure 6 

ONLY APPROVED CANADIAN WALL PASS 
THROUGH

Summary of Contents for Grand Teton PS130WTS

Page 1: ...E ANY NEED TO OBTAIN A PERMIT OBSERVE ALL LOCAL BUILDING CODES OPERATING INSTRUCTIONS AND OWNER S MANUAL Model PS60WTS PS130WTS PSBF66WTS READ INSTRUCTIONS CAREFULLY Please read this entire manual bef...

Page 2: ...H AS BUILDING MATERIALS PAPER OR CARDBOARD A SAFE DISTANCE AWAY FROM THE STOVE AS RECOMMENDED BY THE INSTRUCTIONS NEVER USE THE STOVE IN SPACES WHICH DO OR MAY CONTAIN VOLATILE OR AIRBORNE COMBUSTIBLE...

Page 3: ...w Pellet Consumption Rate Low LBS HR kg HR 1 43 0 65 2 4 1 09 1 48 0 67 Pellet Consumption Rate Medium LBS HR kg HR 1 81 0 82 2 47 1 12 2 16 0 98 Pellet Consumption Rate High LBS HR kg HR 4 01 1 82 6...

Page 4: ...otection see FLOORING SPACE and FLOORING MATERIAL on page 6 Manufactured venting of 3 80mm in diameter of type L or PL which is listed to UL 641 ULC S609 Standard for 650 C Factory Built Chimneys or U...

Page 5: ...E FLU WITH HEADACHE DIZZINESS AND OR NAUSEA IF YOU HAVE THESE SIGNS STOVE MAY NOT BE WORKING PROPERLY GET FRESH AIR AT ONCE HAVE STOVE SERVICED SOME PEOPLE PREGNANT WOMEN PERSONS WITH HEART OR LUNG DI...

Page 6: ...Vertical runs of vent pipe must be at least 3 76 mm from any wall Finally the area which the wood pellet fire stove is installed shall have a floor to ceiling distance of at least 84 2134 mm FLOORING...

Page 7: ...rd attaches to the stove at the exposed socket in the rear of the stove Once any necessary assembly of the display panel screen is complete you may briefly plug your stove in to make sure that it func...

Page 8: ...it will not come into contact with the stove s surface FRESH AIR AND VENTILATION REQUIREMENTS When deciding the location of the stove ensure that the space will always have a source of fresh air avai...

Page 9: ...dential Type and Building Heating Appliance UL 103 A International Conference of Building Officials ICBO standards for solid fuel Stoves code approved masonry chimney VENT TERMINATION Install exhaust...

Page 10: ...annels separated from combustibles by a minimum of 6 inches 152 mm of glass fiber insulation Opening shall be covered and thimble supported with a sheet steel support minimum 24 gauge in thickness Fig...

Page 11: ...red and can not be moved tipped or have ventilation seals compromised The stove must be provided a permanently ducted source of outside air to support combustion which meets the following requirements...

Page 12: ...ites of chimney manufacturers will be able to provide stove pipe that is rated to these standards This listing indicates that the Chimney is rated for high temperatures up to 2100 F 1 149 C Only use c...

Page 13: ...he pellet sediment debris at the bottom of the pellet container Store pellets in sacks made of environmentally neutral or biologically degradable plastic or from paper 2 3 layers similar to cement pac...

Page 14: ...hrough the following stages Cleaning Cycle The firepot draws dust ash remnants out Feeding Cycle Pellets will be transported from the Pellet Hopper into the fire pot by the auger This can take 5 to 15...

Page 15: ...tton Step 4 Enter the verification code that was emailed to you in the Enter Verification Code field Step 5 Now you can set a unique password for your device in the Set Password field and hit the Done...

Page 16: ...ECO 1 The stove shuts off when the desired temperature has been reached The stove will turn back once the room cools to a factory set temperature ECO 2 The stove turns to minimum power preset P4 when...

Page 17: ...e stove Displays the exhaust pipe temp the hopper protection temp and number of run hours etc Settings Press to enter User Settings Menu Figure 17b On this menu you may select F or C ECO Mode see Wi F...

Page 18: ...y day Whichever is more frequent Ash Drawer After 50 bags of wood pellets Passageways After 100 bags of wood pellets Blower After 100 bags of wood pellets CLEANING FIRE POT PAN CAUTION IF STOVE IS INT...

Page 19: ...ny ash or debris build up Build up of debris and ash can restrict the flow of gases which will affect stove performance and failure to remove creosote may result in a dangerous chimney fire FLYASH FOR...

Page 20: ...the most up and most left position of the prepared gasket gutter 5 Continue pressing the replacement gasket clockwise along the gasket gutter until it has wrapped back to where the gasket was pressed...

Page 21: ...ned to the base If a low pressure is created in the firebox by a leak opening the door to the firebox a blocked flue or an unsealed ash drawer then the switch will shut the stove off as a precaution E...

Page 22: ...using low quality fuel in fire pot 2 Check that the firepot is sitting in the holder correctly and that the igniter is not obstructed 3 Check that the exhaust gas temperature sensor switch beside the...

Page 23: ...itch Power Cord disconnected 1 Press power cord tightly into the heater 2 Ensure that the wall socket is delivering 120 Volts Fuse is blown Replace the fuse The blower does not turn on during Cleaning...

Page 24: ...eding speed After the fire has started the stove turns off 15 minutes later The pellet hopper is low on fuel Check that the pellet hopper has a sufficient amount of fuel The auger is not operating 1 U...

Page 25: ...Replace the 30 o C temperature switch The fire extinguishes and the power shuts off continued Requested temperature has been reached This is normal ECO mode behavior The stove will automatically swit...

Page 26: ...sensor NO NC NO NC C Wifi Pellet Test Vaccum switch Display panel Blower Combustion Fan Auger motor Igniter GND FUSE Power GND N L Shorting Switch NOTE IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE...

Page 27: ...Long 13 n a Flue Fixed Plate Short 14 n a Pedestal Fixed Plate 15 66626 Left Side panel 16 66627 Right Side panel 17 n a Thermal Insulation Plate 18 n a Insulation Support Plate 19 66607 Combustion B...

Page 28: ...Ground Screw 24 66610 Vacuum Switch 25 66611 Silicone Tube 26 66612 Circulation Blower 27 n a Chamber Insulation Cover NO P N DESCRIPTION 28 66613 Safety Sensor 29 n a Motherboard Fixed Plate 30 6661...

Page 29: ...66622 Silicone Rubber Sealing Ring 10 66615 Power Socket 11 66663 Motherboard 12 66638 Fire Pot 13 66639 Vacuum Switch 14 66640 Igniter 15 66641 Combustion Blower 16 66612 Circulation Blower NO P N DE...

Page 30: ...upply us with the purchase date and the name and address of the dealer from whom you purchased our product The foregoing is the full extent of the responsibility of the Company There are no other warr...

Page 31: ...CODES DE LA CONSTRUCTIONS LOCAUX GUIDE DU PROPRI TAIRE ET INSTRUCTIONS D UTILISATION No de mod le PS60WTS PS130WTS PSBF66WTS LIRE LES INSTRUCTIONS ATTENTIVEMENT Veuillez lire le pr sent manuel au com...

Page 32: ...U MANUEL NE JAMAIS UTILISER LE PO LE DANS UN LIEU AYANT OU QUI A POSSIBILIT D AVOIR DES MATI RES VOLATILES EN SUSPENSION DANS L AIR OU DES PRODUITS COMME L ESSENCE DES SOLVANTS DES DILUANTS PEINTURE D...

Page 33: ...ois Grenailles de bois Chauffe approximativement m2 pi2 139 4 1 500 232 3 2 500 167 2 1 800 Monoxyde de carbone produit g min Sur r glage lev 0 59 Sur r glage bas 0 77 Sur r glage lev 0 00 Sur r glage...

Page 34: ...r de montants Fil plomb Scie sauteuse Silicone haute temp rature ou scellant haute temp rature ou ruban de conduit de fum e haute temp rature Protection de plancher voir SUPERFICIE DE PLANCHER et MAT...

Page 35: ...ES TOURDISSEMENTS ET OU NAUS ES SI VOUS SOUFFREZ DE CES SYMPT MES LE PO LE POURRAIT EN TRE LA CAUSE EN RAISON DE MAUVAIS FONCTIONNEMENT OBTENEZ DE L AIR FRAIS RESPIRER SUR LE CHAMP FAITES UN ENTRETIEN...

Page 36: ...out mur Finalement l a pi ce dans laquelle le po le grenailles de bois est install devra avoir une hauteur de plafond d au moins 2 134 mm 84 po MAT RIAUX DE REV TEMENT DE SOL La protection de plancher...

Page 37: ...on lectrique Le cordon d alimentation se branche dans la prise l arri re du po le Apr s tout assemblage requis du panneau d affichage vous pouvez brancher votre po le temporairement pour vous assurer...

Page 38: ...le EXIGENCES D AIR FRAIS ET D A RATION Lorsque vous d cidez de la localisation du po le assurez vous que l aire sera toujours approvisionn e d air frais Un manque d air pourrait appauvrir tous les app...

Page 39: ...e ma onnerie certifi e ICBO International Conference of Building Officials pour les po les combustible solide CAPUCHON D VENT Installer l vent d chappement en respectant les distances de d gagement sp...

Page 40: ...et la section de chemin e support e et fix e deux montants d acier de calibre minimum no 24 La quincaillerie de fixation de la section de chemin e ne doit pas perforer sa paroi interne TECHNIQUES DE...

Page 41: ...fa on compromettant une a ration ad quate Une canalisation permanente d admission d air frais pour entretenir la combustion devra tre install e en r pondant aux exigences suivantes La canalisation de...

Page 42: ...domiciliaires les quincailleries et les magasins de fournitures CVCA ainsi que les sites Web de fabricants de chemin es pourront vous fournir des tuyaux de po le isol s r pondant ces normes Cet enreg...

Page 43: ...sacs deux ou trois couches de papier comme ceux des sacs de ciment ou faits de produits synth tiques biologiquement d gradables et neutres au point de vue environnemental L utilisation de grenailles d...

Page 44: ...tr mie 3 Appuyez sur le bouton d alimentation Le po le proc dera automatiquement effectuer ce qui suit Cycle de nettoyage Le pot de combustion est nettoy des cendres poussi res et r sidus accumul s Cy...

Page 45: ...z votre adresse courriel dans le champ Courriel et cliquez sur le bouton Obtenir le code de v rification tape 4 Entrez le code de v rification qui vous a t envoy par courriel dans le champ Saisir le c...

Page 46: ...llumera une temp rature de la pi ce pr r gl e en usine ECO 2 Lorsque la temp rature d sir e est atteinte le po le passe en chauffage minimum pr r glage P4 Il se remettra un r glage plus lev lorsque la...

Page 47: ...ent la temp rature de protection de la tr mie et le nombre d heures de fonctionnement etc Param tres Appuyez sur pour acc der au menu des param tres utilisateur Figure 18b Dans ce menu vous pouvez s l...

Page 48: ...lon la premi re ventualit Tiroir de cendre Apr s 50 sacs de grenailles de bois Canalisations internes Apr s 100 sacs de grenailles de bois Ventilateur Apr s 100 sacs de grenailles de bois NETTOYAGE PO...

Page 49: ...umulation de d bris et les cendres peuvent restreindre le d bit de gaz qui affectera la performance du po le et ne pas retirer la cr osote pourrait r sulter en un dangereux feu de chemin e CENDRES VOL...

Page 50: ...tanch it r sistant aux temp ratures lev es l int rieur du sillon 4 Presser l extr mit du joint d tanch it de remplacement dans le sillon pr par partir du point gauche le plus lev 5 Continuer presser...

Page 51: ...e par une fuite l ouverture de la porte du pot de combustion une chemin e obstru e ou un tiroir de cendre non scell le pressostat teindra le po le comme mesure de pr caution Le code d erreur E5 s affi...

Page 52: ...upport et qu il n y a pas d obstruction devant l allumeur 3 S assurer que le capteur de temp rature de gaz d chappement adjacent au ventilateur de combustion est en bon tat et n a pas subi de dommage...

Page 53: ...s rer fond le cordon d alimentation dans le po le 2 S assurer que la prise murale fournit une tension de 120 V Le fusible est grill Remplacer le fusible Le ventilateur ne tourne pas durant les cycles...

Page 54: ...e coincement 3 S assurer que la vis de fixation de la tari re au moteur est bien serr e Le thermostat de temp rature de 30 C s est d clench 1 S assurer que les fils du thermostat sont bien connect s 2...

Page 55: ...sse de grenailles Le thermostat de temp rature de 30 C s est d clench 1 S assurer que les fils du thermostat sont bien connect s 2 Remplacer le thermostat de 30 C La combustion s arr te et le po le in...

Page 56: ...t NO NC NO NC C Wifi Test de granul s Pressostat Panneau d affichage Ventilateur Ventilateur de combustion Moteur de tari re Allumeur GND FUSIBLE Alimmentation GND N L Court circuit Changer REMARQUE S...

Page 57: ...8 66613 Capteur de s curit 29 n a Plaque fixe de la carte m re 30 66631 Capot arri re 31 66615 Prise de courant 32 66616 Capteur de pi ce 33 66622 Joint d tanch it en caoutchouc silicone 34 66617 Comm...

Page 58: ...e 30 66614 Capot arri re 31 66615 Prise de courant 32 66616 Capteur de pi ce 33 n a tiquette de notation 34 66617 Commutateur de couvercle de tr mie 35 n a Outil de nettoyage voir n 47 36 n a Ventilat...

Page 59: ...silicone dix 66615 Prise de courant 11 66663 Carte m re 12 66638 Pot de feu 13 66639 Commutateur de vide 14 66640 Allumeur 15 66641 Souffleur combustion No No de pi ce DESCRIPTION 16 66612 Ventilateu...

Page 60: ...nt la demande de compensation Veuillez galement nous indiquer la date d achat ainsi que les nom et adresse du d positaire o vous avez achet votre produit Ce qui suit est la description compl te de la...

Reviews: