Mountz Inc. 1080N 11
th
Street, San Jose CA 95112 Ph (408) 292-2214 Fax (408) 292-2733
www.mountztorque.com
35
Half-circle gaps
Pin
O-ring
Fig. 99
Pulse Cylinder Seat
Greasing screw
3.2
After installing the front cover, put the O-ring on the greasing screw, then tighten the greasing screw but
not tighten it completely.
4.0 Pulse Cylinder Seat and Lock Nut of Pulse Cylinder Assembly
4.1 Place the O-ring inside the bottom of the pulse
cylinder seat, then combine the pulse cylinder
seat with the assembled pulse cylinder unit. (Fig. 98, Fig. 99)
Make sure the half-circle gaps aim at the corresponding positions.
(b) Fig.95
Back up ring
Front cover
X-ring
Back up ring
Greasing screw
O-ring
Fig.97
Pressure Valve
Rear Plate
O-ring
(a) Fig.94
(c) Fig.96
Corresponding position
O-ring
Fig. 98
Pulse Cylinder Seat