Mountz Inc. 1080N 11
th
Street, San Jose CA 95112 Ph (408) 292-2214 Fax (408) 292-2733
www.mountztorque.com
15
Half-circle gaps
Pin
O-ring
Fig. 36
Pulse Cylinder Seat
Greasing screw
3.2 After installing the front cover, put the O-ring on the greasing screw, then tighten the greasing screw
but not tighten it completely.
4.0 Pulse Cylinder Seat and Lock Nut of Pulse Cylinder Assembly
4.1
Place the O-ring inside the bottom of the pulse cylinder seat, then
combine the pulse cylinder seat with the assembled pulse cylinder
unit. (Fig. 35, Fig. 36)
Make sure the half-circle gaps aim at the corresponding positions.
4.2
Use the appliance to push out the rear plate from the pulse cylinder seat. See Chart 2 in reference to
the proper appliance selection. (Fig. 37)
4.3
Fill up the interior pulse cylinder with the pulse oil about 90% full by a syringe. (Fig. 38)
(b)
Fig.32
Back up ring
Front cover
X-ring
Back up ring
Greasing screw
O-ring
Fig.34
Pressure Valve
Rear Plate
O-ring
(a)
Fig.31
(c)
Fig.33
Corresponding position
O-ring
Fig. 35
Pulse Cylinder Seat