
GSM-204-423
Installation overview
31st Oct 01
Installation & Configuration: Horizon
macro outdoor
68P02902W03-A
CONTROLLED INTRODUCTION
Inst. 3–1
Installation overview
Introduction to
installation
This chapter provides the information required to install the Horizon
macro
outdoor cabinet and its internal and external interfaces.
CAUTION
Ensure that all site associated equipment is completely
installed before commissioning the cabinet for operation.
NOTE
Some site equipment may not be produced by Motorola,
including battery chargers, power supplies, and antennas.
Refer to site-specific documentation and non-Motorola
vendor instructions.
Before starting an installation, ensure the site has been prepared according to
the description summarised in Preparation overview in Chapter 2, and the
site-specific documentation.
Installation
sections
Installing cabinets comprises the sections shown in Table 3-1.
Table 3-1 Installation sections in this chapter
Section
Description
Equipment delivery
and unpacking
Information on delivery packaging, and how
to unpack the equipment.
Fitting outdoor
cabinet onto base
Provides procedure for attaching cabinet to
prepared plinth.
Earthing and transient
protection
Describes site earthing procedures and
cabinet internal earths.
Connecting the
internal batteries
Describes the procedure for connecting up
the internal batteries.
Installing power and
earth cabling
Describes the power supply earthing
requirements.
Connecting input
power
Describes the correct sequence for power
connection.
Connecting antennas
and RF configurations
Describes setting up antenna connections
and sample RF configurations.
Interface cabling
Describes cabling to the interface panel.
E1/T1 line
testing
If an E1/T1 line has been provided, contact the local MSC and, at the earliest
opportunity, arrange to test the line back to the MSC.