GSM-204-423
Introduction to installation and configuration
31st Oct 01
Installation & Configuration: Horizon
macro outdoor
68P02902W03-A
CONTROLLED INTRODUCTION
Inst. 1–1
Introduction to installation and configuration
Manual scope
This category (GSM-204-423) covers installation and commissioning for the
cabinet, arranged in the following chapters:
Chapter 1 Introduction
General information, safety precautions, and information about tools needed to
install the equipment.
Chapter 2 Site preparation
Describes the procedures to be followed for initially preparing the site and
installing the necessary ducting and concrete base.
Chapter 3 Installation of outdoor cabinet
All procedures necessary to install the cabinet ready for operation, with an
overview of the different configurations available.
Chapter 4 Installing the cable shroud
Procedures for installing the optional cable shroud in various configurations.
Chapter 5 Installing the auxiliary equipment cabinet
All procedures necessary to install the optional auxiliary equipment cabinet,
ready for operation.
Chapter 6 Commissioning of outdoor cabinet
All procedures necessary to enable the cabinet to be fully operational.
Chapter 7 Decommissioning of outdoor cabinet
All procedures necessary to decommission the outdoor cabinet.
NOTE
For hardware optimization and base site integration, refer
to
Installation and Configuration: BSS Optimization:
(GSM-100-423) 68P2901W43.