25
Initial Layer Z Overlap: Determines the amount of overlap between the first and
second layers of the model.
Brim line amount: Sets the number of ring gaskets that are added to the edge of the
model in contact with the build platform.
Skirt Line Count: Sets the number of anti-overflow lines at the end of the model in
contact with the build platform.