FUSION Compact Bread Plant, Rev. A21 14-04-21
79
OPERATING THE METRO MOULDER
To ensure the best mould, make sure that the moulder is free of any previous dough
used and set the following adjustments.
a.
Hopper width. (move cheeks(15) to required width).
b.
Sheeting gap. (move lever (16))
c.
Side guides position.(turn wheel (6) to adjust pressure board width)
d.
Moulding pressure.(turn handle (17) to adjust pressure board height)
a.
HOPPER WIDTH ADJUSTMENT.
1.
Slacken wing bolts (
14
) and slid the hopper cheeks (
15
) to the required
setting.
See chart above for suggested settings.
2.
Hand-tighten wing bolts and go on to next adjustment.
14
15
14
Summary of Contents for fusion compact
Page 4: ...FUSION Compact Bread Plant Rev A21 14 04 21 4 ...
Page 9: ...FUSION Compact Bread Plant Rev A21 14 04 21 9 BREADPLANT ASSEMBLED SECTION 1 ...
Page 57: ...FUSION Compact Bread Plant Rev A21 14 04 21 57 ...
Page 58: ...FUSION Compact Bread Plant Rev A21 14 04 21 58 ...
Page 59: ...FUSION Compact Bread Plant Rev A21 14 04 21 59 ...
Page 60: ...FUSION Compact Bread Plant Rev A21 14 04 21 60 ...
Page 61: ...FUSION Compact Bread Plant Rev A21 14 04 21 61 YASKAWA INVERTER DEFAULT SETTINGS ...
Page 64: ...FUSION Compact Bread Plant Rev A21 14 04 21 64 ELECTRICAL DISTRIBUTION ...
Page 65: ...FUSION Compact Bread Plant Rev A21 14 04 21 65 CONTROL CIRCUIT ...
Page 84: ...FUSION Compact Bread Plant Rev A21 14 04 21 84 ...
Page 85: ...FUSION Compact Bread Plant Rev A21 14 04 21 85 11 0 ELECTRICAL INFORMATION ...
Page 86: ...FUSION Compact Bread Plant Rev A21 14 04 21 86 ...
Page 87: ...FUSION Compact Bread Plant Rev A21 14 04 21 87 ...