FUSION Compact Bread Plant, Rev. A21 14-04-21
81
START BUTTON
STARTING THE METRO
Before starting ensure the metro has been adjusted for the product mould
required. (See previous section.)
If using in conjunction with a prover, make sure that the Metro is in the
correct position with the hopper.
Do not allow dough pieces to “skin” as this will result in the dough pieces
catching each other up, “doubling”, and could cause a jam.
To start the machine press the green button
found on the main body next to the
stop switch.
If used with a prover always start the moulder before the prover or a build up of
dough could clog the moulder hopper
Summary of Contents for fusion compact
Page 4: ...FUSION Compact Bread Plant Rev A21 14 04 21 4 ...
Page 9: ...FUSION Compact Bread Plant Rev A21 14 04 21 9 BREADPLANT ASSEMBLED SECTION 1 ...
Page 57: ...FUSION Compact Bread Plant Rev A21 14 04 21 57 ...
Page 58: ...FUSION Compact Bread Plant Rev A21 14 04 21 58 ...
Page 59: ...FUSION Compact Bread Plant Rev A21 14 04 21 59 ...
Page 60: ...FUSION Compact Bread Plant Rev A21 14 04 21 60 ...
Page 61: ...FUSION Compact Bread Plant Rev A21 14 04 21 61 YASKAWA INVERTER DEFAULT SETTINGS ...
Page 64: ...FUSION Compact Bread Plant Rev A21 14 04 21 64 ELECTRICAL DISTRIBUTION ...
Page 65: ...FUSION Compact Bread Plant Rev A21 14 04 21 65 CONTROL CIRCUIT ...
Page 84: ...FUSION Compact Bread Plant Rev A21 14 04 21 84 ...
Page 85: ...FUSION Compact Bread Plant Rev A21 14 04 21 85 11 0 ELECTRICAL INFORMATION ...
Page 86: ...FUSION Compact Bread Plant Rev A21 14 04 21 86 ...
Page 87: ...FUSION Compact Bread Plant Rev A21 14 04 21 87 ...