![Moffat turbofan EH Series Installation And Operation Manual Download Page 8](http://html1.mh-extra.com/html/moffat/turbofan-eh-series/turbofan-eh-series_installation-and-operation-manual_1823053008.webp)
Installation
6
The Oven / Proofer is fitted with a water filtration system. This sys-
tem will require the Filter
Cartridge and the Double Check Valve connecting to the Filter Body.
And the filter system connecting to the mains water supply, Follow
the instructions below to connect up the water filter system.
1. Connect Tube Connection fitted with Double Check Valve, to
the Connector on Filter Body inlet side.
2. Fit Filter Cartridge to the Filter Body. (
¼
turn clockwise bayo-
net fitting).
3. Connect Double Check Valve to main water supply connection.
4. Connect up power supply to Prover / Holding Cabinet and turn
‘On’ the appliance.
5. Turn on the mains water supply and carry out a leak check of
the Prover / Holding Cabinet.
- Max Inlet Pressure 80psi / 550kPa.
- Min Inlet Pressure 22psi / 150kPa.
Each Humidified Holding Cabinet should be connected to an
adequately protected power supply and an isolation switch mounted
adjacent to, but not behind the Humidified Holding Cabinet and
must be readily accessible to the operator. This switch must be
clearly marked and readily accessible in case of fire.
Check that the electricity supply is correct to as shown on the
Technical Data Plate on the front right hand corner of Humidified
Holding Cabinet side panel.
The EHT10 Humidified Holding Cabinet is supplied with factory fit-
ted power cord and plug.
1. Correctly locate the Humidified Holding Cabinet into its final
operating position and lock the front castors to retain the
Cabinet in it’s location.
2. The Humidified Holding Cabinet should be positioned so that
the control panel and shelves are easily reachable for loading
and unloading.
To ensure correct ventilation for the motor and controls, the
following minimum installation clearances are to be adhered to:-
Top
0” / 0mm.
Rear
1” / 25mm (without Stand Off Brackets Fitted).
Left-hand side
0” / 0mm.
Right-hand side 1” / 25mm.
Before leaving the new installation;
Check the Humidified Holding Cabinet functions in accordance
with the operating instructions specified in the ‘Operation’
section of the ‘Installation and Operation’ manual.
Ensure that the operator has been instructed in the areas of
correct operation and shutdown procedure for the appliance.
NOTE:
If it is not possible to get the appliance to operate
correctly, turn off the power supply at the mains
supply and contact the supplier of this appliance.
T
HIS
H
UMIDIFIED
H
OLDING
C
ABINET
MUST
BE
EARTHED
/
GROUNDED
.
I
F
THE
SUPPLY
CORD
IS
DAMAGED
,
IT
MUST
BE
REPLACED
BY
A
SUITABLY
QUALIFIED
PERSON
IN
ORDER
TO
AVOID
A
HAZARD
.
Filter
Cartridge
Mains Water Inlet
Pipe c/w Double
Check Valve.
Proofer Water Con-
nector
Filter Body
Double Check Valve
2 mtr Water Supply
Connection Hose