
EN
20
6. De-commissioning and Demolition
1) De-commissioning and demolition
Start by setting the main switch to the “0”
or OFF position.
Disconnecting from the power outlet
Disconnect the steam machine from
the electrical network by switching off
the associated circuit breaker or circuit
protection device. Remove the power
supply cord from the power connection.
Disconnecting from the water system
Shut off the water supply by closing the
specific tap located upstream of the water
filter/softener inlet. Disconnect the water
pipe at the water filter/softener inlet.
Remove the hose connecting the steam
module to the main water supply. Remove
the reinforced plastic tubing on the drain
connection.
At this point, the machine may be removed
from the bar, being very careful not to drop
it or squash your fingers.
The machine is made out of various
materials and therefore, if you do not
intend to put it back in service, it must
be taken to a special disposal company
which will select the materials which can
be recycled and discard the others.
Current regulations make it illegal to
discard such machine by leaving it on
public grounds or on any private property.
Recycling notice: Warning for the protection of the
environment:
Used Electrical and electronic waste con
-
tains hazardous but also valuable and scarce
materials which should be recovered and
recycled properly. We kindly ask that you
contribute to the protection of the environ
-
ment and natural resources by delivering
used equipment to the relevant recycling
locations if such locations are available in
your country.
Summary of Contents for NEW STEAM
Page 24: ......
Page 48: ......
Page 72: ......
Page 96: ......
Page 97: ...modbar steam system Modbar Steam Modbar...
Page 99: ...RU 3 1 70 8 1 80...
Page 100: ...RU 4 8 2 3 4 5 6 7 8 9...
Page 101: ...RU 5 10 11 12 13 14 0 OFF...
Page 107: ...RU 11 2 200 75 52 C 124 C 150 150 350 20 100...
Page 108: ...RU 12 0 24 0 6 150...
Page 109: ...RU 13 1 Modbar 0 Off I II 2 Modbar OFF 3 OFF 4 3 8 G BSP 1 3 220 50 60 1 200 50 60...
Page 112: ...RU 16 4 1 a Modbar OFF 2 OFF 3 52 C...
Page 113: ...RU 17 4 7 2 7 1 65 70 C 5 Modbar 6 7 8...
Page 114: ...RU 18 OFF 5 30 52 C...
Page 115: ...RU 19 1 2 3 4 5 I Steam boiler refresh refresh 7 6 2 8...
Page 116: ...RU 20 6 1 0 OFF...
Page 117: ...RU 21 7 5 3 2 4...
Page 118: ...RU 22 Modbar Modbar...
Page 119: ...RU 23 Modbar 0 24 0 6...
Page 120: ......