© MOBATIME
6/40
BE-801259.05-HN 60&61master clock
2
INSTALLATION
2.1 Installation environment
The following installation places should be avoided:
•
within the reach of high-voltage operated equipment
•
places exposed to direct impact of solar radiation
2.2 Installation procedure
•
Snap the clock box onto the DIN rail
•
Terminate all supply cables on the terminal box at the top of the clock box.
•
The wall mounting case has holes for supply cables in the top and rear of the case.
•
Connect the DCF receiver (GPS antenna), slave clock line cables, switching circuit,
power cable.
•
Switch-on the mains power. The current time is displayed on the Master clock
2.3 Terminal board connection
2.3.1 DIN rail variant HN 60/61/60i//61i