Putting the unit into service
43
Installation instructions
8 Putting the unit into service
If the unit is not put into service immediately after being
connected and the function check, all inspections must be
repeated.
Requirement
Power connection made
Water connection established
Wastewater connection established
Exhaust connection made (if required by the customer)
Operation successfully checked
Housing closed
1. Instruct the operator.
2. Fill out the commissioning report.
8.1 Filling out the Commissioning report
General
Yes
No
Information from the nameplate entered?
SN: _____________________________ Typ: _____________________________
E: ________________________________________________________________
Bez: ______________________________________________________________
Item-Nr.: _____________________________ (if listed)
Obvious damage to the unit?
What and where?:
______________________________________________________________________________
Unit levelled?
Electrical connection
Yes
No
Power connection made properly?
Equipotential bonding
Power optimizing system
Floating contact
…
Electrical connections made properly?
Residual-current protective device connected immediately before this unit?
Residual-current protective device connected before this and other units?
Connection voltage measured?
Connection voltage: _______________ (V)
Set transformer voltage
T0: 0 V | ______ V | ______ V; T1: blue 0 V | red ______ V; T2/T3: blue ______ V | red ______ V
Kitchen management system
Yes
No
Has the kitchen management system been connected properly?
10013865-0AIBE-B