-
87
-
'16 • SCM-T-199
2.
SELECTING
INST
ALLA
TION
LOCA
TION
After getting customer
’s approval, select installation location according to following guidelines.
1. Indoor unit
•
Where
there
is
no
obstruction
to
the
airflow
and
where
the
cooled
and
heated
air
can
be
evenly
distributed.
•
A solid place where the unit or the wall will not vibrate.
•
A place where there will be enough space for servicing. (Where space mentioned on the right side can be secured.)
•
Where it is easy to conduct wiring and piping work.
•
A place where unit is not directly exposed to sunlight or street light.
•
A place where it can be easily drained.
•
A place separated at least 1m away from the television or the radio. (T
o prevent interference to im
-
ages and sounds.)
•
A place where this unit is not af
fected by the high frequency equipment or electric equipment.
•
Avoid installing this unit in place where there is much oil mist.
•
A place where there is no electric equipment or household.
•
Install
the
indoor
unit
on
the
wall
where
the
height
from
the
floor
to
the
bottom
of
the
unit
is
more
than
180 cm.
2.
W
ireless
remote
control
•
A place where the air-conditioner can receive the signal surely during operating the wireless remote control.
•
A place where it is not af
fected by the
TV and radio etc.
•
Do not place where it is exposed to direct sunlight or near heat devices such as a stove.
Wireless remote control
Remote control holder
Wood screws
5 cm minimum from the wall
10 cm minimum from the wall
Installation board
10 cm minimum from the ceiling
(a) Sleeve
180 cm minimum from the floor
Installation example
Indoor unit
Obstacle such as curtain
10 cm
8 cm
Be sure that the flap of outlet should not
touch any obstacles
.
3. INST
ALLING INST
ALLA
TION BOARD
•
Installation board should be installed on the wall which can support the weight of the indoor unit.
•
Adjustment
of
the
installation
board
in
the
horizontal
direction
is
to
be
conducted
with
five
screws
in
a
temporary tightened state.
•
With the standard hole as a center
, adjust the board and level it.
Standard
hole
Bolt (M6X12)
530
450
Mating mark for level surface
In
case
of
fixing
the
unit
on
concrete
wall,
use
nut
anchor.
Installation boar
d
50
(Service Space)
142.
5
170
58
5
53
0
45
0
21
0
435
(Service Space)
Unit
142.
5
170
210
435
55
(Gas pipe)
SRK20, 25, 35 : 469 SRK50 : 475
Unit: mm
528 (Drain hose) 537 (Liquid pipe)
55
100
43
100
9
266
13
190
47
80 (Service Space)
(Service Space)
185
47
CAUTION
Improper adjustment of the installation board can cause water leakage.