8 - 11 8 - 11
MELSEC-Q
8 ONLINE MODULE CHANGE
(b) Click the [OK] button to leave the "Online module change" mode.
(c) Click the [Close] button to close the System monitor screen.
(d) Choose [Online] - [Debug] - [Device test] on GX Developer, and set the
buffer memory contents recorded in step (1)(b) to the buffer memory.
(e) Since the new module is in a default status, it must be initialized by a
sequence program after control resumption.
Before performing initialization, check whether the contents of the
initialization program are correct or not.
1) Normal system configuration
The sequence program should perform initialization on the leading
edge of Module Ready (X9) of the QD60P8-G.
When control resumption is executed, Module Ready (X0) turns ON
and initialization is performed. (If the sequence program performs
initialization only one scan after RUN, initialization is not performed.)
2) When used on remote I/O network
Insert a user device that will execute initialization at any timing
(initialization request signal) into the sequence program. After control
resumption, turn ON the initialization request signal to perform
initialization. (If the sequence program performs initialization only one
scan after a data link start of the remote I/O network, initialization is not
performed.)
Summary of Contents for QD60P8-G
Page 1: ......
Page 2: ......
Page 14: ...A 12 A 12 MEMO ...
Page 18: ...1 4 1 4 MELSEC Q 1 OVERVIEW MEMO ...
Page 95: ...7 12 7 12 MELSEC Q 7 PROGRAMMING MEMO ...
Page 115: ...9 7 9 7 MELSEC Q 9 TROUBLESHOOTING MEMO ...
Page 121: ...App 2 App 2 MELSEC Q APPENDIX MEMO App ...
Page 124: ...Index 3 Index 3 MEMO ...
Page 127: ......
Page 128: ......