34
Control circuit specifications
2.3.5
Mounting the operation panel (FR-DU07) on the enclosure surface
Having an operation panel on the enclosure surface is convenient. With a connection cable, you can mount the
operation panel (FR-DU07) or the parameter unit (FR-PU07) to the enclosure surface, and connect it to the inverter.
Use the option FR-CB2
, or the connector and cable available on the market.
(For mounting the operation panel (FR-DU07), the optional connector (FR-ADP) is required.)
Securely insert one end of connection cable until the stoppers are fixed.
for RS-485 communication.
REMARKS
· Refer to the following when fabricating the cable on the user side. Keep the total cable length within 20m (65.6 feet).
Commercially available product examples (as of February 2012)
STF FWD PU
Parameter unit connection cable
(FR-CB2
)(option)
Operation panel(FR-DU07)
Parameter unit (FR-PU07)
(option)
Operation panel connection connector
(FR-ADP)(option)
* Do not use pins No. 2, 8 of the communication cable.
Product
Type
Maker
Communication cable
SGLPEV-T (Cat5e/300m)
24AWG × 4P*
Mitsubishi Cable Industries, Ltd.
RJ-45 connector
5-554720-3
Tyco Electronics Corporation
Summary of Contents for -NAFR-F720-00167-NA
Page 22: ...12 MEMO ...
Page 364: ...354 MEMO ...
Page 378: ...368 MEMO ...
Page 396: ...386 MEMO ...