![background image](http://html.mh-extra.com/html/mitsubishi/mj-ez6cx-s1-it/mj-ez6cx-s1-it_service-manual_1809048036.webp)
ޓ
Back cover
Louvre
Catches (2)
Inside of the
switch holder
Operation
control board
Operation control board
Operation control board setscrew
③
③
④
⑤
⑤
Front cover
①
Pull out the water tank.
→
(Reference : Removing the water tank)
②
Remove the left case.
→
(Reference : Removing the left case)
③
Remove the front and back cover.
④
Remove the catches (2) which fix the switch
holder from the louvre side of the right case with a
slotted screwdriver. Remove the switch holder.
⑤
Remove the operation control board setscrews (3)
and all the connectors of the operation control
board.
→
(Removing and replacing the operation control
board)
(4) Removing and replacing the operation control board
Switch holder
Louvre
④
36
Summary of Contents for MJ-EZ6CX-S1-IT
Page 50: ...Issued in 2010 7 ...