2
5
[Fig. 5.0.1]
8 m
=
>
40
°
=
<
8 m
=
>
C
C
<A>
<B>
C
D
C
B
A
A
B
D
1990
(10) *1
990
16
602
570
550
45
900
990
45
900
990
45
900
45
990
45
900
45
16
602
570
550
16
602
570
550
(1254)
(50) *2
45 45
E
F
990
400
990
550
600
(10) *1
(50) *2
400
400
990
990
400
550
550
400
600
(1254)
B
C
D
A
D
A
F
D
E
E
B
C
<A>
<B>
[Fig. 6.1.1]
[Fig. 6.1.2]
[Fig. 6.2.1]
6.2
A
Heat exchanger unit
B
Compressor unit
C
4-ø14 (Anchoring hole)
D
(Top view)
A
Piping space (for side piping)
B
Heat exchanger unit
C
Compressor unit
D
Service space (front side)
E
(Top view)
F
Piping space
E
Anti-vibration pad etc.
F
Concrete base
6.1
6
*1
Select an installation site that is level and free from vibrations so that the side
panels of the units do not rub against each other.
*2
Select an installation site that allows the fixation of the units to the floor.
<A> Side-by-side installation
<B> Back-to-back installation
*1
Select an installation site that is level and free from vibrations so that the side
panels of the units do not rub against each other.
*2
Select an installation site that allows the fixation of the units to the floor.
<A> Side-by-side installation
<B> Back-to-back installation
WT04624X03_p02
06.10.26, 11:30 AM
2