16
(Drainage)
When drain socket is installed
2
246
When drain socket is installed
233
Air intake
5
4
1 2 3
6 7 8 9
Knock out hole for upper drain pipe arrangement Knock out hole for fresh air intake Ø100 Knock out hole for wiring arrangement 2-Ø22 Knock out hole for wiring arrangement 2-Ø26
Drainage pipe connection(26mmI.D.) Drainage pipe connection(for the left arrangement) Knock out hole for left drain-piping arrangement Refrigerant-pipe connection(gas pipe side/flared connection) Refrigerant-pipe connection(liquid pipe side/flared connection)
NOTES. 1.Use M10 or W3/8 screw for anchor bolt. 2.Please be sure when installing the drain lift up mechanism(option parts), refrigerant pipe will be only upward.
Air outlet
233
Electrical box
When electrical box is pulled down
Electrical box
9
7
In case of the rear pipe arrangement,make sure to remove the shaded portions from the independent piece. Then put the independent piece back in initial position.(The heat exchanger might be clogged because of dust)
5
10
51
246
180
200
236
150
62
140
18
1237(Suspension bolt pitch)
320
680
80
84
88
195
230
57
254
476
680
182
85
11
98
8
48
260
24
38
85
86
2
126
169
37
121
138
190
1
18
38
120°
1280
2
2
11
73
124
76
46
190
75
387
461
2
3
8
5
1
4
Ø125
6
8
[FRONT
VIEW]
Ceiling
(Drainage)
(gas Ø15.88)
(liquid Ø9.52)
Accessory···Drain
socket (I.D. 26)
PCFY-P63VKM-E
PCFY-P63VKM-ER1
Unit : mm
OCH449A