9
GB
3. Installing the HBC controller
3.1. Checking the accessories with the HBC
controller
The following items are supplied with each HBC controller.
3.2. Installing HBC controllers
Installing hanging bolts
Install locally procured hanging bolts (threaded rod) following the procedure given in
the figure. The hanging bolt size is ø10 (M10 screw).
To hang the unit, use a lifting machine to lift and pass it through the hanging bolts.
The suspension bracket has an oval hole. Use a large diameter washer.
[Fig. 3.2.1] (P.3)
Be sure to install the HBC controller horizontally. Check using a level. If
the controller is installed at an angle, drain water may leak out. If the unit
is slanted, loosen the fixing nuts on the hanging brackets to adjust its
position.
Install the HBC level (less than 1° tilt), so that the drain pan can function
correctly.
Caution:
•
Be sure to install the unit horizontally.
Install the HBC level (less than 1° tilt), so that the drain pan can function
correctly.
4. Connecting refrigerant pipes and drain pipes
4.1. Connecting refrigerant pipes
1. Be sure to use non-oxidative brazing where necessary. If you do not use non-oxi-
dative brazing, it may clog the pipes.
When brazing the outdoor unit connecting port of HBC controller, supply nitrogen
gas into the pipe between the outdoor unit and HBC controller.
2. After completing pipe connection, support the pipes to ensure that load is not
imparted to the HBC controller’s end connections.
Warning:
When installing and moving the unit, do not charge it with refrigerant other
than the refrigerant (R410A) specified on the unit.
- Mixing of a different refrigerant, air, etc. may cause the refrigerant cycle to mal-
function and result in severe damage.
Caution:
•
Use refrigerant piping made of phosphorus deoxidized copper and copper
alloy seamless pipes and tubes. In addition, be sure that the inner and outer
surfaces of the pipes are clean and free of hazardous sulphur, oxides, dust/
dirt, swarf, oils, moisture, or any other contaminants.
- R410A is a high-pressure refrigerant and can cause the existing piping to burst.
•
Store the piping to be used during installation indoors and keep both ends
of the piping sealed until just before brazing. (Store elbows and other joints
in a plastic bag.)
- If dust, dirt, or water enters the refrigerant cycle, deterioration of the oil and
compressor failure may result.
- Infiltration of a large amount of mineral oil may cause the refrigerant oil to dete-
riorate.
•
Do not vent R410A into the atmosphere.
•
R410A is a Fluorinated Greenhouse gas, covered by the Kyoto Protocol
with a Global Warming Potential (GWP) = 2090.
1. Size of HBC controller’s end connection piping
[Fig. 4.1.2] (P.3)
Note:
•
Be sure to use non-oxidative brazing.
*1. PURY-(E)P-400YLM model or larger requires a connection of two main-HBC
controllers in parallel.
4.2. Refrigerant piping work
After connecting the refrigerant pipes of the outdoor units with the outdoor units’ stop
valves remained fully closed, evacuate vacuum from the outdoor units’ stop valve
service ports.
After completing the above, open the outdoor units’ stop valves. This connects the
refrigerant circuit (between outdoor and HBC controller) completely.
How to handle stop valves is described on each outdoor unit.
Precautions for HBC controller combinations
Refer to [Fig. 4.2.1] for the positioning of twinning pipes.
[Fig. 4.2.1] (P.3)
Model name
CMB-WP108V-GA1
CMB-WP1016V-GA1
Item
Qty
1
Drain hose
1
2
Cable tie
1
3
Hose band
1
4
Installation manual
1
5
Air vent manual
1
6
Wrench
1
Model name
CMB-WP108V-GB1
CMB-WP1016V-GB1
Item
Qty
1
Drain hose
1
2
Cable tie
1
3
Hose band
1
4
Installation manual
1
5
Air vent manual
1
1
Hanging method
A: Min.30 mm
A
Hanging bolt ø10 (field supply)
B
Washer (field supply)
HBC CONTROLLER
Unit model
Model name
High pressure
side
Low pressure
side
PURY-(E)P200
(HBC CONTROLLER)
CMB-WP108V-GA1
CMB-WP1016V-GA1
*1
ø15.88
(Brazing)
ø19.05
(Brazing)
PURY-(E)P250
ø19.05
(Brazing)
ø22.2
(Brazing)
PURY-(E)P300
ø19.05
(Brazing)
ø22.2
(Brazing)
PURY-(E)P350
ø19.05
(Brazing)
ø28.58
(Brazing)
PURY-(E)P400
ø15.88 (Brazing)
for each HBC
ø19.05 (Brazing)
for each HBC
PURY-(E)P450
ø15.88 (Brazing)
for each HBC
ø22.2 (Brazing)
for each HBC
PURY-(E)P500
ø19.05 (Brazing)
for each HBC
ø22.2 (Brazing)
for each HBC
A
To outdoor unit
B
End connection (brazing)
C
Main-HBC controller
D
Sub-HBC controller
E
Indoor unit
F
Twinning pipe (field supply)
G
Up to three units for 1 branch hole; total capacity: below 80 (but in same mode, cool-
ing/heating)
Pipe size
HBC controller 1
HBC controller 2
ø15.88 (Brazing)
Ou
td
oo
r u
n
it s
ide
WT07554X01.book 9 ページ 2015年3月31日 火曜日 午前9時25分