SHIPPING AND INSTALLATION
Shipped products will be delivered in shrink
plastic packaging in a way to get affected from
external weather conditions minimally.
Fan and control panel taken from the package
without mounted will be installed by your
authorized service. While receiving your
device, check; The model you ordered with
incoming delivery, Whether there are any
damages during shipment.
Determine any damaged devices or missing
parts to be sent with the device and inform our
authorized dealer.
MIT brands products are heavy products, so care should be taken while moving the product to
install in the place. You can find information about weight of the product you purchased in boiler
weight table (Page 11 - Table 1). You can lower the device with a vehicle suitable for tonnage of
the product (crane and/or fork-lift trucks).
Determination Of The Place Of Device Assembly
Figure-3A (Front View)
Figure-3B (Side View)
Figure-3C Boiler Room Settlement Plant (Top View)
A = A Distance of Boiler Length.
B = A Distance of Boiler Width.
Arrange the location of boiler room and boiler assembly location in accordance with Technical
Specifications published by Gas Distributor companies. From the point of safety of you and
your environment, never install the device in daily life sections (kitchen, bathroom, hallway etc.),
open spaces and balconies, places where explosive and easily flammable materials exist. Boiler
problems that may arise during use or toxic waste, gas leakages due to return of flue gas after the
blockage of the chimney may arise. For this reason, boilers should be installed in places outside
residents and places with continuously ventilation. The place where the device will be installed
must have vents connected directly to external environment and that allow fresh air entrance.
Vents that should always be kept open must be at least in 40 cm x 40 cm dimensions in upper and
lower sections of boiler room. Fuel transfer lines must comply with valid technical specifications,
regulations and standards. For better ventilation of device and protection against decays caused
by water accumulation, the boiler must be placed onto a platform of 15 cm height. Based on
boiler dimensions, dimensions of the platform that will be made of concrete material are given in
Figure-3A and Figure-3B. A place must be selected with adequate space for carrying out device
installation, combustion and necessary maintenances. In the field shown in Figure-3C, no other
devices, fuel or materials cannot be found that may prevent casual work and safety.