DETECTION AND FIXING OF ERRORS/MALFUNCTIONS

Error Name

Error Description

Fixing Applications

Ignition does not occur

Burner failure

Please follow the burner 

manufacturer

Dark smoke coming out of chimney

Low air surplus coefficient, Low 

supply voltage

Check fresh air coming into boiler 

room or air setting of burner. Voltage 

drop results in decrease of engine 

speed, low fuel air mixture.

Knocking in water section of boiler

Air in installation. Installation and 

assembly error

Drain the air. Check connections 

as per installation assembly circuit 

diagram.

Overheating in boiler water

Circulation pump failure Thermostat 

failure

Please check whether there is 

reverse turning in circulation pump. 

Check whether the boiler thermostat 

is working.

Failure in increasing boiler exit 

water temperature

High water speed Selection of 

burner unsuitable to boiler capacity

If circulation pump is speed-

adjusted, speed should be reduced, 

if it is single-speed, by reducing 

valve, tuning should be made or

Pump should be replaced with an 

appropriate pump.

Make your burner checked by 

authorized service.

Water accumulation or leakage in 

smoke chest

Condensation of water vapor in 

flue gas

Failure in operating boiler in low 

temperature, failure in reducing 

flue gas temperature under 70°C at 

boiler exit.

3 or 4-way valve should be used, 

thermostat settings of boiler should 

be high. The condensed water must 

be drained with a connection from 

the lowest elevation of smoke chest.

Condensation drain may have 

clogged.

Paint cover burning, heat increase, 

refractory concrete and turbulator 

deformation

Wrong burner selection and higher 

setting

Burner change, renovation to 

suitable conduit dimension and 

burner setting are necessary.

Increase in flue gas temperature

Operating without turbulator or 

missing turbulators, wrong burner 

setting and selection

It may be required to install 

turbulator and eliminate 

deficiencies, carry out setting 

of burner normally and procure 

suitable burner.

If water continuously decreases in 

the boiler

Mechanical / Installation failure

1. Possible leakage in installation. 

Check the installation.

2. If water is coming from inside the 

boiler, there may be leakage in 

pipe or body.

3. Expansion tank might be low 

on air.

Summary of Contents for TLG 100

Page 1: ...Heating Boiler User Guide...

Page 2: ...www facebook com ekinendustriyel www youtube com ekinendustriyel www linkedin com company ekinendustriyel www soundcloud com ekinendustriyel www twitter com ekinendustriyel www spotify com ekin endus...

Page 3: ...stioning of the status quo and our desire to outperform ourselves New Generation Engineering With our engineering approach that focuses on the process not the problem we do not just specialize in a pr...

Page 4: ...te Valves Actuators Check Valves and Strainers Thermoplastic Valves Boilers Steam Generators Solar Collectors Chillers Cooling Towers Gasketed Plate Heat Exchangers Brazed Heat Exchangers Shell Tube H...

Page 5: ...1 Precautions 3 Product General Specifications 7 Shipping And Installation 13 First Run And Considerations Before First Run 20 Boiler Water Specifications 21 General Maintenance 21 Detection And Fixi...

Page 6: ...te of the period for such repairs Device repair duration shall not exceed 20 business days This duration shall start from the date of notification to the service station and in the event of the absenc...

Page 7: ...outside the scope of warranty In case of wrong connection while installing electricity connection of the device any related failures shall be outside the scope of warranty Failure to comply with techn...

Page 8: ...r problems originated from boilers installed in living quarters In installations with closed expansion tank make sure to use automatic safety valve suitable for boiler operating pressure Our company c...

Page 9: ...e explosion of the boiler In this case please check the circulation pump working immediately close burner and wait for cooling in natural way then contact to authorized service To prevent any accident...

Page 10: ...er does not work again related burner authorized service must be called If you feel or smell gas or if there is a gas leak Stay calm Extinguish any burning fires Open doors and windows Close valves of...

Page 11: ...nical support we remind you to prepare the following information for providing better service to you Located on the aluminum sheet label on the device 1 Year of manufacture and serial number of the de...

Page 12: ...1 2 1 2 1 2 1 2 Back Pressure mbar 1 2 1 3 1 5 2 2 2 3 2 5 Standard Operating Pressure bar 4 4 4 4 4 4 Ekin End striyel MG series gas fueled heating boilers are manufactured with three pass Known as...

Page 13: ...1 2 1 2 1 1 1 Back Pressure mbar 2 8 3 3 8 5 2 5 2 5 7 Standard Operating Pressure bar 4 4 4 4 4 4 TLG TECHNICAL SPECIFICATIONS Model TLG 600 TLG 700 TLG 800 TLG 900 TLG 1000 TLG 1250 Capacity kcal h...

Page 14: ...2 5 Back Pressure bar 4 4 4 4 4 TLG TECHNICAL SPECIFICATIONS Model TLG 1500 TLG 1750 TLG 2000 TLG 2500 TLG 3000 TLG 3500 Capacity kcal h 1 500 000 1 750 000 2 000 000 2 500 000 3 000 000 3 500 000 kW...

Page 15: ...se mbar 3 3 3 2 8 2 5 3 Back Pressure bar 4 4 4 4 4 TWG TECHNICAL SPECIFICATIONS Model TWG 450 TWG 500 TWG 600 TWG 700 TWG 800 TWG 1000 Capacity kcal h 450 000 500 000 600 000 700 000 800 000 1 000 00...

Page 16: ...2289 Height L mm 2720 2920 3515 3915 3915 4219 Length L1 mm 2194 2394 2994 3394 3394 3698 Foot record E mm 500 500 500 500 500 500 Chimney Diameter H2 mm 1460 1460 1585 1585 1643 1670 Chimney Height...

Page 17: ...635 2687 Height L mm 5245 5251 5345 5747 6721 Length L1 mm 4724 4730 4826 5226 6200 Foot record E mm 500 500 500 600 600 Chimney Diameter H2 mm 1776 1884 1884 1966 2014 Chimney Height F DN 200 200 200...

Page 18: ...panies From the point of safety of you and your environment never install the device in daily life sections kitchen bathroom hallway etc open spaces and balconies places where explosive and easily fla...

Page 19: ...elbow is required it is crucial to use round and wide angle elbows and not to use more than two elbows Steel chimney connection must be manufactured and assembled in a way to disassemble from boiler...

Page 20: ...PIPING FEEDING WATER OUTLET DISCHARGE VALVE CUT OFF VALVE TEMPERATURE PROBE DISCHARGING PIPE DIRT SEPERATOR AIR RELIEF COCK SAFETY VALVE CIRCULATION PUMP CHECKVALVE THREE WAY VALVE MANOMETER THERMOME...

Page 21: ...ry Fed Operation Time Mod 1 20 35 mA Mod 2 8 10 mA Available Battery Type 5 hours Rechargeable Battery Rechargeable Battery NiMh 9V Battery Charging Method Constant Current and Constant Voltage Batter...

Page 22: ...g down when there is temperature difference between boiler water temperature and adjusted thermostat temperature as much as burner first stage difference temperature the burner is activated at first l...

Page 23: ...ry After adjusting system with stages above adjust thermostat temperature with up arrow button When you turn off the device with device On Off button the system will start to work in this configuratio...

Page 24: ...ch burner second stage adjustment menu press Selectbutton five times and you will see the following screen 2 Hold the up arrow button the indicator will display off on screenwhen you select 98 3 Wait...

Page 25: ...pass valve Air must be taken from air intake valves and air relief cocks in the installation Circulation pump should not be run during air intake Ekin End striyel is not responsible for the burner on...

Page 26: ...ck the following considerations Monitor operations of boiler fittings thermostat thermometer hydrometer manometer all the time do the necessary controls replace it if necessary By putting thin mineral...

Page 27: ...external temperature is 12 C and lower When external air temperature is between 12 15 C heating system should be operated in limited mode If external air temperature is 15 C and higher heater should...

Page 28: ...e missing water It is required to use with appropriate safety valve Closed expansion tanks can only be used in liquid and gas fueled heating systems provided automatic control mechanical combustion Fu...

Page 29: ...mbly Scheme 1 Gas filter 2 Test nipple 3 Push tap and manometer 4 Compensator 5 Global gas valve 6 Gas entry line 7 Mutliblock gas valve Filter Regulator Minimum gas processor Safety gas valve operati...

Page 30: ...laced with an appropriate pump Make your burner checked by authorized service Water accumulation or leakage in smoke chest Condensation of water vapor in flue gas Failure in operating boiler in low te...

Page 31: ...there is AC energy input to the system Temperature warning is flashing on the screen Overheating in boiler Boiler temperature increases over 95 degrees Lower the temperature The burner cannot be activ...

Page 32: ...27 CERTIFICATES...

Page 33: ......

Page 34: ...ICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERV...

Page 35: ......

Page 36: ...4EK N Dudullu Organize Sanayi B lgesi Des Sanayi Sitesi 107 Sk B14 Blok No 2 mraniye stanbul Turkey Phone 90 216 232 2412 Fax 90 216 660 13 08 info ekinendustriyel com www ekinendustriyel com Is tma S...

Reviews: