Mechanical Installation
4
Conduits for Wiring
AC power must be run through a dedicated conduit, in knockouts A or B, shown in Figure 3. All other circuits are
current limited, and must be run through knockouts C or D.
Figure 3: Conduits for Wiring
Clearances
The controls shall be no less than 600 mm and no more than 1800 mm above the finished floor.