F3 Field Service Manual – Level 1 Maintenance
Page 26
Figure 29 Electronics Pack showing Main Wiring Loom in cut out (orange) and
Ribbon Cover (blue), Split grommet (red) and Bulkhead Cover (green) on Main
Wiring Loom
•
Ensure that the ribbon cable cover, split grommet and bulkhead cover are
threaded on the main wiring loom (in that order).
Note:
Extreme care must be taken when plugging in the main wiring loom plug.