5 Installation
5.1 Safety instructions
NOTICE
Welding or lightning strike current lowing through the cell can damage it.
All electrical welding on the weighing system must be inished before mounting the load
cells.
If the load cells are not set up in the hygienic area (e.g., outdoor applications), the
upper and lower mounting plates must be connected with each other using lexible
copper straps.
The following must be observed during installation:
-
Do not lift or transport the load cell by pulling on the cable.
-
Avoid shock stress (falling down, hard shocks).
-
The load cell must be installed vertically and centrally in the mounting kit.
-
Load forces must act in the measuring direction of the load cell.
-
The load disc must not be subjected to transverse forces.
-
All contact points between load cell and load disc must be adequately greased.
Load cell grease order no., see Chapter
.
NOTICE
Changes of temperature >15 K/h may inluence the measuring accuracy.
Make sure to protect the load cells from direct heating or cooling efects (sun, wind,
heat radiation, fan heaters), e.g., heat protection screens or heat protection
housings are to be installed if necessary.
NOTICE
Force shunts may cause measuring errors.
All incoming and outgoing lines (hoses, pipes, cables) must be coupled to the
measured object as lexibly as possible.
5 Installation
Hygienic Compression Load Cell PR 6202
Minebea Intec
EN-13
Summary of Contents for PR 6202
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 53: ...1 6...
Page 54: ...2 6...
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......