8 - 2
8.3
Performing Maintenance
To ensure that the equipment is ready for operation at any time
,
perform the following tests as recommended:
The equipment connected to the AED ALERT system can be managed remotely, which could reduce the site
maintenance All the maintenances performed on the AED ALERT system must be in compliance with the local
regulations.
NOTE
•
Auto test checks the expiration of electrode pads only when the electrode pads have such function.
8.3.1
User Test
You can use the already installed battery or a replaced battery to perform the user test on the equipment.
To perform the battery installation test, follow this procedure:
1.
Choose any of the following ways to start the test.
◆
Install the battery for the first time or replace the battery after it is taken out for over three minutes.
◆
Not taking out the battery, hold the Language button for 5s and flip the Adult/Child mode switch
twice.
◆
Not taking out the battery, hold the Shock button for 5s and flip the Adult/Child mode switch twice.
2.
Perform operations following the voice instructions.
All items are tested hereafter automatically after you respond to the equipment. If any failure is detected,
corresponding prompts are provided.
You can also perform the user test using the AED Tool software. For more information, see
AED Tool Instructions
for Use.
CAUTION
•
Frequently turning on or off the equipment during the user test will reduce the battery standby life.
Maintenance Item
Recommended Frequency
Test Item
User test
•
After installing the battery
•
After replacing the battery
•
After each use
Performs function tests of the main control
module, the therapy module, the power
module, electrode pads, 1J charge and
discharge, 360J charge and discharge, controls,
the speaker.
Auto test
Automatically, whenever the
equipment is powered on, or
when a battery is installed.
Performs function tests of the main control
module, the therapy module, the power
module
Once a day
Performs function tests of the main control
module, the therapy module, the power
module, electrode pads expiration, 1J charge
and discharge
Once a week
Once a month
Performs function tests of the main control
module, the therapy module, the power
module, electrode pads expiration, 1J charge
and discharge, 200J charge and discharge, the
speaker.
Once a quarter
Performs function tests of the main control
module, the therapy module, the power
module, electrode pads expiration, 1J charge
and discharge, 360J charge and discharge, the
speaker.
Electrode pads check
Once a month
Checks the electrode pads are not expired.
Summary of Contents for BeneHeart C Series
Page 2: ......
Page 10: ...4 This page intentionally left blank ...
Page 14: ...1 4 This page intentionally left blank ...
Page 22: ...3 4 This page intentionally left blank ...
Page 34: ...6 4 This page intentionally left blank ...
Page 40: ...8 4 This page intentionally left blank ...
Page 42: ...9 2 9 2 Miscellaneous Description Model PN Disposable battery LM34S002A 022 000411 00 ...
Page 50: ...A 8 This page intentionally left blank ...
Page 64: ...E 4 This page intentionally left blank ...
Page 68: ...F 4 This page intentionally left blank ...
Page 70: ...G 2 This page intentionally left blank ...
Page 72: ...H 2 This page intentionally left blank ...
Page 74: ......
Page 75: ...I 1 I Declaration of Conformity ...
Page 76: ...I 2 ...
Page 77: ......
Page 78: ...P N 046 012619 00 2 0 ...