© 2014 MIMAKI ENGINEERING CO.,LTD.
Change Tracking P.2
Service Documents > Change Tracking
Change Tracking
Date
2012.10.15
Manual Ver.
1.7
Remark
Status
Index
Rev.
Changes
Revised
4.5-P.14
1.1
The illustration is changed.
Revised
7.2-P.1
7.2-P.2
1.1
1.3
Page is deleted.
Revised
7.3-P.1
7.3-P.2
7.3-P.3
1.3
1.2
1.2
Entire change according to the work for air purge was added.
Date
2012.06.07
Manual Ver.
1.6
Remark
Status
Index
Rev.
Changes
Revised
7.2-P.4
1.2
"Target value" is changed.
Date
2012.05.29
Manual Ver.
1.5
Remark
Status
Index
Rev.
Changes
Revised
5
1.1
6c and 6c+W ink set are deleted, and 4c+W is added.
Revised
5.1-P.2
1.2
The illustration of the coupling is changed.
Ink set 6c and 6c+W are deleted, and 4c+W is added.
Revised
5.1-P.3
1.2
An important item of step 2 is changed.
Revised
5.2
1.2
The ink label illustration is changed.
Revised
7.2-P.4
1.2
Step 6 is deleted (The following numbers advance).
Date
2012.05.15
Manual Ver.
1.4
Remark
Status
Index
Rev.
Changes
Revised
4.3-P.11
1.1
Deleted:Step6)
Revised
4.3-P.12
1.1
Step number advances.
Date
2012.03.16
Manual Ver.
1.3
Remark
Status
Index
Rev.
Changes
Revised
4.3
1.1
3) of Step 3 was added.
Date
2012.02.07
Manual Ver.
1.20
Remark
Status
Index
Rev.
Changes
Revised
3
1.1
Installation Space was revised.
Revised
7.3
1.1
The procedure of the air purge was changed.
Date
2012.01.11
Manual Ver.
1.10
Remark
Status
Index
Rev.
Changes
Revised
4.4
1.1
Step4 was added.
Revised
5.1
1.1
The connection of the ink tube was changed.
Revised
5.2
1.1
Hint was added.
Label of accessories was changed.
Summary of Contents for JV400-130LX
Page 49: ......
Page 50: ...D500698 22 30042014 2013 MIMAKI ENGINEERING CO LTD KF FW 2 50...