Avoiding Damage From Allied Remote Chemical Delivery Systems
PELLERIN MILNOR CORPORATION
Figure 3:
Dribbling From Chemical Supply Line Into Machine
(assumes positive closure at the pump)
Examples
Legend
D.
Portion of supply line, the contents of which can dribble into the machine
P.
Pump
T.
Chemical tank
3.
Design and Installation Recommendations
It is the responsibility of the chemical system manufacturer and supplier to use whatever
measures are necessary to ensure that their system is safe for personnel and equipment.
The
following are some of the possible methods the manufacturer or supplier may wish to use, as
appropriate.
3.1.
Siphoning: Positively close the line.
—If the pump does not provide positive closure
when the system is off, employ a shutoff valve in the line to serve this purpose.
3.2.
Siphoning: Break the siphon.
—Provide an air gap or vacuum breaker in the chemical
delivery line. This must be located above the “full” line of the tank.
3.3.
Dribbling: Flush the entire chemical delivery line.
—If any concentrated chemical
that remains in the injection line between the pump and the machine is free to flow into the
machine, employ a system that flushes the entire line between the pump and the injection point
with fresh water after each injection.
29
Summary of Contents for 76032
Page 2: ......
Page 6: ......
Page 11: ...Safety and Maintenance 1 7 ...
Page 27: ......
Page 29: ......
Page 43: ...Structural and Drive Components 2 39 ...
Page 48: ...44 ...
Page 52: ...BMP910003 91132V Page 1 CBW LOAD CHUTE AND SEAL 48 ...
Page 56: ...BMP910017 91341V Page 1 CBW ENTRY AND EXIT WATER COLLECTORS 52 ...
Page 60: ...56 ...
Page 65: ...61 ...
Page 69: ...Water and Steam Schematics and Devices 3 65 ...
Page 80: ...76 ...
Page 100: ......
Page 101: ...Chemical Supply Devices 4 97 ...
Page 103: ...99 ...
Page 106: ......
Page 107: ...Control and Sensing Assemblies 5 103 ...
Page 113: ...109 ...
Page 114: ...110 ...
Page 117: ...113 ...