![Milnor 6458 Installation Manual Download Page 45](http://html1.mh-extra.com/html/milnor/6458/6458_installation-manual_1797124045.webp)
Pellerin Milnor Corporation
Figure 2. Pedestal Options and Hardware Connections
Electrical Options Mounted to the Pedestal Fronts
Hardware Connections
Legend
DH..
Cut-away of the front right corner
of the Dryer house.
E...
Front top cross member
H1..
Inverter box support and/or cross
member, one is standard.
H2..
Cross member, H2, is supplied
when the front leg heights are
58”[1473 mm] or taller.
Q...
Location of the optional blower in-
verter box when mounted to the
pedestal front
R...
Location of the buck boost trans-
formers when mounted to the pedes-
tal front, when specified
S...
Location of buck boost transformers
and blower inverter box when
mounted to the pedestal front
T...
Typical
U...
Optional bumper guards
V...
Bolt the house to the pedestal in 8
places.
Typical Hardware
Pedestal Base Installation
2 of 4
5050, 6450, 6458, 6464, 7676, & 8282 Dryers
41
Summary of Contents for 6458
Page 2: ......
Page 8: ......
Page 9: ...Safety 1 5 ...
Page 32: ......
Page 33: ...Installation 2 29 ...
Page 75: ...Installation Drawings 3 71 ...
Page 76: ......
Page 77: ...73 ...
Page 78: ...74 ...
Page 79: ...75 ...
Page 80: ......
Page 81: ...77 ...
Page 82: ...78 ...
Page 83: ...79 ...
Page 84: ...80 ...
Page 85: ...81 ...
Page 86: ......
Page 87: ...83 ...
Page 88: ...84 ...
Page 89: ...85 ...
Page 90: ...86 ...
Page 91: ...87 ...
Page 92: ...88 ...
Page 93: ...89 ...