INSTALLERS!
ATTENTION
FLOOR IS UNEVEN
SHUTTLE RAIL BRACKETS
MUST BE GROUTED TO Z
DRYER FEET MUST
BE GROUTED
DRYER MUST BE LEVEL
SHUTTLE RAILS MUST BE PERFECTLY
PARALLEL TO DRYER FACES
DRYER FACES MUST BE FLUSH
Establish System Zero Line or Z.
Find highest point in factory floor where footpads will be located.
System Zero Line or Z is 1” above highest point.
Shim & level to System Zero Line or Z.
Grout & anchor all brackets.
Shim & level to System Zero Line or Z.
Grout & anchor all brackets.
Floor rails must be parallel, level, and square along entire length of rail.
MOVE TO
FOOTPAD LOCATIONS
TO NEXT
FOOTPAD
Z
Y
Z
Z
Z
Z
Y
Y
Y
90°
90°
MARK
POINT
LASER
LEVEL
LEVEL
ROD
FOOTPAD
HIGHEST
POINT
FOOTPAD
HIGHEST
POINT
FOOTPAD
HIGHEST
POINT
MINIMUM
GROUT
1” (25mm)
MINIMUM
GROUT
1” (25mm)
MINIMUM
GROUT
1” (25mm)
FOOT
PAD
FOOT
PAD
GROUT
GROUT
SHIM
SHIM
GROUT
GROUT
GROUT
SYSTEM
ZERO
LINE
SYSTEM
ZERO
LINE
SYSTEM
ZERO
LINE
SYSTEM
ZERO
LINE
DRYER
REFERENCE
LINE
DRYER
REFERENCE
LINE
RAIL LEVELING
PLATES ARE ALSO
PROVIDED FOR
FINE ADJUSTMENT
OF RAIL.
SHUTTLE FLOOR RAIL
5’ MINIMUM LEVEL
FLUSH
+/- .125”(3mm)
FLUSH
+/- .125”(3mm)
LOAD
SHELF
EQUAL
EQUAL
EQUAL
SHUTTLE
FLOOR
RAILS
Use rail spacing guide
to insure the two rails
are parallel to each other.
SHUTTLE
Gap between Dryer Load
Shelf and Shuttle should be
.
1”(25mm)
B2T2007003/2019193A
SHIM
GROUT
GROUT
30
Summary of Contents for 6458
Page 2: ......
Page 8: ......
Page 9: ...Safety 1 5 ...
Page 32: ......
Page 33: ...Installation 2 29 ...
Page 75: ...Installation Drawings 3 71 ...
Page 76: ......
Page 77: ...73 ...
Page 78: ...74 ...
Page 79: ...75 ...
Page 80: ......
Page 81: ...77 ...
Page 82: ...78 ...
Page 83: ...79 ...
Page 84: ...80 ...
Page 85: ...81 ...
Page 86: ......
Page 87: ...83 ...
Page 88: ...84 ...
Page 89: ...85 ...
Page 90: ...86 ...
Page 91: ...87 ...
Page 92: ...88 ...
Page 93: ...89 ...