Appendixes
61
A
PPENDIX
3 P
OST
I
NSTALLATION
C
HECKLIST
W
HAT IS THE
P
OST
I
NSTALLATION
C
HECKLIST
?
It is highly recommended that a Millipore SAS Service Representative installs the Elix System. The Pre Installation Manual and
the Installation Manual are not found in this Owner’s Manual.
Place a check in the box next to the item or items as they were done during the installation of an Elix 30, Elix 50, Elix 100, Elix
150 or Elix 200 Water Purification System.
Some “Comments” areas are provided throughout the Post Installation Checklist. These can be used to document any comments.
As an example, a comment could be made and recorded pertaining to the fact that the Drain was 3 meters away from the Elix
System. The comment could be written such that you indicate your knowledge of this and that you are willing to go outside a
specification in order to complete the installation.
P
OST
I
NSTALLATION
C
HECKLIST
Was Appendix 2 in this manual read and reviewed (accounting for items in the Shipping Box)?
Was the Inlet Solenoid Valve water flow direction identified (is the water flowing in the correct direction through the Inlet
Solenoid Valve)?
Were the specifications for the Feedwater minimum pressure and minimum flowrate met?
Were the specifications for the electrical supply and electrical connections (distance to source, earth grounded) met (see the
Pre Installation document for these specifications)?
Was the RO Reject Tubing kept to a maximum length of 2.5 meters?
Was the Progard TL Pack installed such that:
it is located on front left side of the Elix System?
it was installed according to the directions given in Section 2-4 in the Installation Manual?
Did the Elix System go through either a 5 minute SYSTEM CLEANING (Progard TL without chlorine tablet inside) or a 20
minute SYSTEM CLEANING (Progard TL with a chlorine tablet inside)?
Was the RO RINSE done according to the directions given in Section 2-6 in the Installation Manual? Was the RO RINSE
completed?
Was the pump pressure checked during PRODUCTION Mode (checked against operating temperature – see Section 2-5 in the
Installation Manual)? Was the pump pressure adjusted if necessary?
Was the RO Reject flow to the drain measured?
Was the Elix System Recovery checked using the DATA information in PRODUCTION Mode?
Was the Elix System Recovery changed if necessary according to Section 2-5 in the Installation Manual?
Were the Date and Time set for the Elix System?
Were the units of Pressure changed if necessary?
Were the Storage Reservoir Units changed if necessary?
Were the Conductivity or Resistivity values checked in PRODUCTION Mode for Temperature Compensation or Non
Temperature Compensation (according to the user requirements)?