WRG02 Water Recycling Assembly Installation:
Tank installation:
Warning!
Before starting work, ensure that the wall is strong enough to support the load. The tank weight is approx. 200 kg.
Note
Use the holder frame as a template.
–
Take the required measurements from the appropriate installation plan.
–
Drill 10 mm dia. holes.
Warning!
Pay attention to different height measurements!
Note
The hardware supplied can be used for concrete
≥
B 15 and undrilled wall tiles
≥
MZ 15.
For other types of wall, suitable hardware must be provided on site.
–
Screw two M 6 x 16 bolts into the top mounting nuts.
–
Hang the tank in the top mounting holes.
–
Screw in the remaining bolts (6 x) and tighten them.
–
Secure the hoses on the container lid with 32 - 50 mm dia. hose clips; see Fig. 19.
–
Insert the hose connectors (Fig. 19, Pos. 1) into the angled hoses and secure with 32 - 50 mm dia. hose clips.
Warning!
Pay attention to the positioning of the vent hose!
–
Secure the connection hose to the drain valve on the tank with a 40 - 60 mm dia. hose clip.
–
Secure the angled drain hose to the drain valve with 40 - 60 mm dia. hose clip.
Filter assembly:
–
Connection to machine, see (Fig. 20, Pos. 1).
Note
The pipe (Fig. 20, Pos. 4) is not required with installation behind the machine.
For installation with WS 5240/5320 the pipe (Fig. 20, Pos. 4) must be installed between the elbow (Fig. 20, Pos. 2) and the bushing
(Fig. 20, Pos. 3).
–
Tank overflow connection, see Fig. 20, Pos. 5.
–
Connection to the on-site drainage system (DN 70), see Fig. 20, Pos. 6.
–
Connection from the immersion pump to the tank, see Fig. 20, Pos. 7.
Produktgruppe 512
Umbau- und Montageanweisung
59 von 60
M.-Nr. 04598534
16.12.2011
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.