Tank/machine/filter assembly hose connections:
–
Use the hose supplied to make the hose connections between the tank, machine and filter assembly in accordance with on-site
conditions; see Fig. 21.
Note
Hose position, see Fig. 21.
Connection to machine, see Fig. 21, Pos. 1.
–
All hose connections should be secured with hose clips. Secure hoses in position using suitable fastenings as appropriate.
Electrical connection:
–
Install the provided 6-terminal terminal block in accordance with the machine's installation plan.
–
Lay the designation strips 1 - 6 under the terminal block.
–
Unwind the connection leads from the control wiring harness and connect them according to their identifying markings.
Note
Alternatively, make connections with the wiring harness provided.
–
Connect the tank drain valve, the immersion pump and filter assembly drain valve to the terminal block in accordance with the
recycling unit (WRG) wiring diagram.
–
Connect the ground lead to the ground screw on the component bracket.
–
Secure leads with cable ties as appropriate.
After installation work has been completed, carry out the following:
–
Check all water connections for leaks and carry out a test run.
–
Place the recycling unit wiring diagram with the machine wiring diagram.
–
Re-install the rear panel and machine lid.
–
Perform an electrical safety check.
–
Reconnect the machine to the power supply.
am
Produktgruppe 512
Umbau- und Montageanweisung
60 von 60
M.-Nr. 04598534
16.12.2011
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.