Initial commissioning
27
Setting up a payment system
If you wish to set up a payment system,
read the “Payment system” section of
the “Supervisor level” chapter. These
settings can only be changed during
the initial commissioning process. If you
wish to change the settings after the
commissioning process, please contact
Miele Service.
If you do not wish to set up a payment
system, you can skip this stage.
11:02
No payment
system
Payment system
OK
Programme
control
Timed
operation
Timed op. +
impul.counter
COM module
Touch the
No payment system
sensor.
The display will change to the next set-
ting.
Completing commissioning
The commissioning procedure is com-
pleted when a programme lasting
longer than 20 minutes has been car-
ried out in full.
If the power is interrupted prior to the
start of the first drying programme
(e.g. if the machine is switched off
with the
button), the initial commis-
sioning process can be completed
again. Once a drying programme has
been running for over 20 minutes, the
initial commissioning process does
not have to be performed again.
Confirm with
OK
.
In the main menu, touch the
Pro-
grammes
sensor.
11:02
Automatic
plus
Timed drying
warm air
Basket - Low
temperature
Microfibre
Timed drying
cool air
Basket
programme
Programmes
Select the
Timed drying cool air
pro-
gramme.
Touch the
Duration
sensor.
OK
00 20
02 59
01 58
01 21
02 22
Duration
h
11:02
Reset
Place your finger on the number that
you want to change and move your
finger in the direction you want.
Select a duration of 20 minutes.
Confirm with
OK
.
Touch the flashing
Start/Stop
sensor.
After this programme has finished, the
tumble dryer is ready for use.