C.A.R.T. FURY
5
C
HAPTER
1 O
PERATION
VIDEO GAME MACHINE ARRAY
SET-UP
1.
Remove all items from the shipping containers and set them aside. Remove all packing material.
Inspect the exterior of the main cabinet, control cabinet and the seat pedestal for any damage.
2.
Remove the keys from the steering wheel. Unlock and open the rear door, and the coin and cash
boxes. Electrical cords, mechanical components, and assorted spare parts are packed inside the cash
box.
3.
Install one nut onto each leg leveler. Tilt as needed to locate four threaded holes under both the main
cabinet and three holes under the pedestal. Install a leveler and nut into each hole. Do not tighten nuts
at this time.
4.
The main cabinet is mounted on casters. Roll the cabinet to its intended location, maintaining clear-
ance between the cabinet and walls, drapes, other games or obstructions.
WARNING
The cabinet is top heavy. Do not push against plastic parts during movement.
Summary of Contents for CART Fury Championship Racing
Page 2: ......
Page 3: ......
Page 4: ......
Page 7: ...CHAPTER ONE C A R T FURY OPERATIONS...
Page 17: ...CHAPTER TWO C A R T FURY ADJUSTMENT DIAGNOSTIC AUDIT MENUS...
Page 45: ...CHAPTER THREE C A R T FURY SERVICE...
Page 59: ...C A R T FURY 15 CHAPTER 3 SERVICE SEAT PEDESTAL SERVICE...
Page 67: ...CHAPTER 4 PARTS 7 C A R T FURY Lamp Assembly A 23252 A C Power Assemblies...
Page 71: ...CHAPTER 4 PARTS 11 C A R T FURY Coin Door Assembly...
Page 79: ...CHAPTER FIVE C A R T FURY WIRING...
Page 81: ...C A R T FURY 3 CHAPTER 5 WIRING Main Cabinet Wiring...
Page 82: ...4 MIDWAY AMUSEMENT GAMES LLC CHAPTER 5 WIRING RF Cage Wiring...
Page 83: ...C A R T FURY 5 CHAPTER 5 WIRING Control Panel Wiring...
Page 84: ...6 MIDWAY AMUSEMENT GAMES LLC CHAPTER 5 WIRING Power Wiring Diagram...
Page 103: ......