III. ASSEMBLY
Top Panel and Base Pad Assembly
1. Install the four leg extensions onto the base pad
using the 1/2"-13 x 1-1/4" screws, 1/2" flat
washers and 1/2" lockwashers supplied in the
Base Pad Kit. See Figure 17. Check that the
orientation of the adjustable 6" leg holes in the leg
bottom is consistent (all to the inside or all to the
outside). The adjustable leg mounting hole is
closer to the edge of the leg than the caster
mounting hole.
2. Install one caster and one adjustable 6" leg onto
each leg extension and tighten securely in place.
3. Install the lower oven cavity onto the base pad.
4. For single ovens ONLY:
Install the top panel using the screws included in
the base pad kit, as shown in Figure 18. Then, skip
ahead to Part C, Conveyor Installation.
For double or triple ovens:
Continue on to Part B, Stacking. Note that the top
panel should NOT be installed for double and triple
ovens until after stacking the oven cavities.
Base Pad Installation
Leg Extension and Caster
Installation
Top Panel Installation
NOTE
DO NOT install top panel onto double or triple ovens
until AFTER stacking the oven cavities. See Part B,
Stacking.
Summary of Contents for PS360E Series
Page 8: ...SECTION 1 DESCRIPTION 8 III DIMENSIONS...
Page 9: ...SECTION 1 DESCRIPTION 9...
Page 34: ...SECTION 2 INSTALLATION 34 NOTES...
Page 44: ...SECTION 4 MAINTENANCE 44...