Operating Instructions Thread tapping units/ Accessoriesr 01/09, Software 4.9
©
01.1994-2016 microtap GmbH
67
a
f
B
U
L2
K
d
L
G
E
V
W1
W
W2
6. Use four M4 x 10 hexagon socket screws (U) to install the preassembled
feed unit (B) to the back of the machine (g)
g
A
7. Insert and fix the cable connector (L2) of the ZAP – control cable (L) to the
I/O Port (d) of the machine.
8. Fix the ZAP – control cable (L) with the cable clamp (K).
9. Reinstall the air filter housing (c).
ATTENTION: The filter pad must be inserted!
10. Insert the cable (W1) of the foot switch (W) to the sleeve (f).
11. Connect the pipe (V) to the screw (E) and to a service unit with kondensed
water; regulate pressure, min. 2 bar, max. 8 bar.
12. Engage the main connector (a) and switch the machine on.
13. Adjust ZAP:
(see chapter „thread tapping with option ZAP via remote control“)