Manufacturing Test
UG0617 User Guide Revision 4.0
50
Figure 34 •
SerDes Loopback Test Passed
7.
To return to the main menu, press
SW7
.
8.6
Power Supply Adapter Test
This following steps verify the power supply adapters for the kit.
1.
Ensure that the board and every power supply adapter works.
2.
Plug a new power supply adapter (12VDC/5 Amps) into the AC power socket.
3.
On the other end of the adapter, insert the DC plug into the J9 jack of the test kit.
4.
Slide ON the main power switch SW6.
5.
Ensure that the power status LEDs (DS1, DS2, DS3, DS8, DS9, DS10, DS11, DS12, DS13, DS14,
DS15, DS16, DS17, and DS18) glow.
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from