Manufacturing Test
UG0617 User Guide Revision 4.0
48
Figure 30 •
DDR3 EAST Test Passed
3.
Press
2
to run the DDR3 WEST test. Wait approximately 4 to 5 minutes to complete this test. A
message is displayed when the test is passed, as shown in the following figure.
Figure 31 •
DDR3 WEST Test Passed
4.
Press
3
to run the SerDes loopback test, as shown in the following figure.
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from