Video Wall Installation Manual – 4WX2H, 5WX2H
Page 11
Rev. 09/2019
•
Slide the Bottom Rail (Part B) into the T-
slot of both Side Rail (Part S) and
Middle Rail by sliding the QC connector
into the rails from the bottom. See
figure 3E.
IMPORTANT: Ensure the Square Nuts
previously inserted in bottom of rails do
not fall out
.
•
Position the Bottom Rail so the distance
between upper part of Top Rail and
centre of Bottom Rail is same as the
measurement C. See figure 3F.
Example:
If measurement C is 30cm, then the
centre of Bottom Rail must be
positioned 30 cm from top of Top Rail.
•
Once in place, tighten the hex bolt that
is on the left side of Bottom Rail using a
6mm Allen wrench (not supplied). See
figure 3G.
IMPORTANT
Do not tighten the hex bolt on right side
yet.
Fig. 3E
Fig. 3F Fig. 3G
•
Slide the 2nd Top Rail (Part B) into the
T-slot of both Side Rail (Part S) and
Middle Rail (Part M) by sliding the QC
connector into the rails from the
bottom. Same as in previous step.
IMPORTANT: Ensure the Square Nuts
previous inserted in bottom of rails do not
fall out
.
•
Position the 2nd Top Rail so the
distance between top of 1st Top Rail
and top of 2
nd
Top Rail is same as the
measurement B. See figure 3H.
•
Once in place, tighten the hex bolt that
is on the left side of 2ndTop Rail using a
6mm Allen wrench (not supplied).
Same as in previous step.
IMPORTANT
Do not tighten the hex bolt on right side
yet.
Fig. 3H