18
32D1999
LOG PLACEMENT
Figure 40 - Placing Front Log (#2)
Bottom Front Log (#2)
VDY30D4 LOG INSTALLATION SEQUENCE:
1. Place Bottom Front Log (#2) on front of grate.
See Figure 40.
2. Place Back Log (#1) on back of base lining up two (2) pins on base with holes
in bottom of log.
See Figures 41 and 42.
3. Place Left Top Log (#3) on left end of Bottom Front and Back Logs.
See
Figure 43.
4. Place Center Crossover Log (#4) across middle of Bottom Front and Back
Logs.
See Figure 44.
5. Place Left Top Crossover Log (#5) up against Left Top Log.
See
Figure 45.
6. Rest Right Top Log (#6) on Center Crossover Log and front of grate.
See
Figure 46.
7. Place Small Front Log (#7) between Center Crossover Log and Top Left Log.
See Figure 47.
Figure 44 - Placing Center Log (#4)
Center Crossover Log (#4)
Figure 45 - Placing Left Top Log (#5)
Left Crossover Top
Log (#5)
Figure 46 - Placing Right Top Log (#6)
Figure 47 - Placing Small Front Log (#7)
Small Front Log (#7)
Figure 42 - Placing back Log (#1)
Figure 43 - Placing Left Top Log (#3)
Back Log (#1)
Top Left Log (#3)
Right Top Log (#6)
Figure 41 - base
Locator Pins