32D1999
15
LOG PLACEMENT
VDY24/18D3R LOG INSTALLATION SEQUENCE
(
Continued
)
5. Rest Top Right Log #5 on Log #3.
See Figure 24.
6. Line up Top Left Log #6 with notches on Log #2 and Log #4.
See Figure 25.
Figure 24 - Placing Top Right Log (#5)
Top Right Log (#5)
Figure 25 - Placing Top Left Log (#6)
Top Left
Log (#6)
Figure 26 - base
Locator Pins
Control Cover
Figure 27 - Placing Rear Log
Rear Log
(#1)
VDY30D3R LOG INSTALLATION SEQUENCE:
1. Line up pins on bottom of Rear Log #1 with pins on grate bar and place on grate.
See Figures 26 and 27.