16
32D1999
LOG PLACEMENT
2. Place Front Left Log #2 on left front of grate bar lining
up cutout in bottom of log with grate bar.
See Figure
28.
3. Place Front Right Log #3 on right front of grate bar
lining up cutout in bottom of log with grate bar. Make
sure Log #3 touches Log #1.
See Figure 29
.
4. Place back end Top Middle Log #4 on Log #1. Press
the side of Log #4 up against raised area of Log #1.
Line up notch in front end of #4 with grate bar.
See
Figure 30.
5. Rest Top Right Log #5 on Log #3.
See Figure 31.
6. Line up Top Left Log #6 with notches on Log #2 and
Log #4.
See Figure 32.
Figure 28 - Placing Front Left Log (#2)
Front Left Log (#2)
Figure 29 - Placing Front Right Log (#3)
Front Right Log (#3)
Figure 30 - Placing Top Mid Log (#4)
Top Mid Log (#4)
Top Right Log (#5)
Figure 31 - Placing Top Right Log (#5 )
Figure 32 - Placing Top Left Log (#6 )
Top Left Log (#6)
VDY30D3R LOG INSTALLATION SEQUENCE
(
Continued
)