Installation and User Manual
Start-up
Following servicing, proceed in the following order: (See Figure 5-3)
1.
Close switch Q1, then after approximately ten seconds, switches QF1, Q5N and Q4S,
2.
0pen bypass switch Q3BP,
3.
Start the inverter (press the "inverter ON" button
7
).
Figure 5-1: UPS Isolation Diagram for Normal AC Bypass Source.
Figure 5-2: Panel Procedures for UPS Isolation.
Figure 5-3: Start-up After Isolation Procedure is Completed.
F
F
1
0
1
0
1
0
1
0
Q5N
Q1
Q4S
3
1
2
Q3BP
1
0
5
4
6
1
0
1
0
1
0
1
0
1
0
1
0
1
0
QF1
0
I
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
Q5N
Q1
Q4S
3
1
2
1
0
Q3BP
1
0
1
0
5
4
6
QF1
0
I
1
0
1
0
1
0
1
0
7
8
Q1
Q5N
QF1
Q3BP
Q4S
AB
C
D
1
2
Maintenance
5 — 3
86-133060-00 A00
Summary of Contents for GALAXY PW 100
Page 6: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA vi 86 133060 00 A00...
Page 34: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA 2 12 86 133060 00 A00...
Page 78: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA 5 8 86 133060 00 A00...
Page 92: ...This page left blank intentionally Galaxy PWTM UPS 100 to 225 kVA A 14 86 133060 00 A00...
Page 94: ...Galaxy PWTM UPS 100 to 225 kVA 86 133060 00 A00...
Page 96: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA W 4 86 133060 00 A00...
Page 100: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA G 4 86 133060 00 A00...
Page 102: ......
Page 103: ......