
■■■■■■■■■■■■■■■■■■■■■■
4 Start-up
942 Extension Module Vario SeS/PP (2.942.0500)
■■■■■■■■
35
4 Start-up
The 942 Extension Module Vario SeS/PP is put into operation together
with the IC instrument.
The following preconditions must be met before initial start-up:
■
The peristaltic pump is installed and connected.
■
A rotor is correctly inserted.
■
The MCS is connected.
■
The 942 Extension Module Vario SeS/PP is connected to the 940 Pro-
fessional IC Vario.
You can find additional information on carrying out initial start-up in the
Start-up
chapter in the manual for the IC instrument and the MagIC Net
online help.