![Metal-Fach SD DUO BIO 16 Technical And Operational Documentation Download Page 34](http://html.mh-extra.com/html/metal-fach/sd-duo-bio-16/sd-duo-bio-16_technical-and-operational-documentation_1777054034.webp)
METAL-FACH
Heating Technology
32
Wiring diagram - additional module B
Wiring diagram - additional module B, where:
M3 - temperature sensor of controlled circuit (mixer3) CT4,
M4 temperature sensor for regulated circuit (mixer 4) CT4,
RM3 - Mixer room thermostat 3,
RM4 - room thermostat for mixer 4,
FS - fuel level sensor for BU feeder operation,
H2 - voltage input to control the stand-by boiler or to signal alarms, or for the hot water circulation pump,
RELAY - relay,
L N PE - mains supply 230V~,
PM 3/4 - mixer pump 3/4,
SM 3/4 - 3/4 mixer actuator,
BU - fuel feeder from the bunker to the hopper in the boiler,
CPU - control,
A - ecoMAX 860P2-T regulator A module.
Summary of Contents for SD DUO BIO 16
Page 1: ......
Page 2: ......
Page 13: ...METAL FACH Heating Technology 11...
Page 49: ...METAL FACH Heating Technology 47...
Page 50: ...METAL FACH Heating Technology 48...
Page 56: ...METAL FACH Heating Technology 54...
Page 58: ...METAL FACH Heating Technology 56...
Page 60: ...METAL FACH Heating Technology 58...
Page 67: ......
Page 68: ......