METAL-FACH
Heating Technology
30
Boiler connection to the electrical installation
(Installer)
The boiler is designed for connection to 230V/50Hz. The installation should be carried out by a qualified person.
The connection socket 230V/10A with earthing should be easily accessible. Boiler power supply and boiler room
lighting should have a different circuit.
Completion of the installation and the heating test must be recorded in the Warranty Card. The completed
Warranty Card should be sent to the manufacturer's address by the user in order to register the user in the
company's system.
NOTE!
The first start-up of the boiler must be carried out only by a service technician trained by
the manufacturer, with a valid certificate of METAL-FACH Authorised Service Provider,
METAL-FACH Distributor or a person holding a SEP license up to 1,5 kW.
NOTE!
All pumps, mixer, relay, igniter etc. are not included in the controller.
Summary of Contents for SD DUO BIO 16
Page 1: ......
Page 2: ......
Page 13: ...METAL FACH Heating Technology 11...
Page 49: ...METAL FACH Heating Technology 47...
Page 50: ...METAL FACH Heating Technology 48...
Page 56: ...METAL FACH Heating Technology 54...
Page 58: ...METAL FACH Heating Technology 56...
Page 60: ...METAL FACH Heating Technology 58...
Page 67: ......
Page 68: ......