Boiler installation
(User | Installer)
An important part of the assembly is a proper setting and leveling of the boiler of SD DUO BIO type, these
boilers do not require special foundations. Boiler leveling is facilitated by adjustable feet. The boiler must stand
vertically.
1.
Check that the four feet are included.
2.
Use a spirit level to level the boiler with the ground. If the boiler is in a horizontal position, the
installation of feet is not required.
3.
Screw the four feet into the designated holes.
4.
Use a spirit level to align the boiler
Installation of the boiler levelling feet
1.
Adjustment foot, pcs. 4
2.
Nut M10, pcs. 8
3.
Washer Ø10, pcs. 8
NOTE!
An improperly leveled boiler can be damaged.
NOTE!
It is unacceptable to place the boiler in a damp or wet room as this accelerates the
corrosion phenomenon, leading in a short time to the destruction of the boiler.
Summary of Contents for SD DUO BIO 16
Page 1: ......
Page 2: ......
Page 13: ...METAL FACH Heating Technology 11...
Page 49: ...METAL FACH Heating Technology 47...
Page 50: ...METAL FACH Heating Technology 48...
Page 56: ...METAL FACH Heating Technology 54...
Page 58: ...METAL FACH Heating Technology 56...
Page 60: ...METAL FACH Heating Technology 58...
Page 67: ......
Page 68: ......