Cleaning and maintenance of the boiler
(User)
NOTE!
The boiler may only be cleaned when the appliance is switched off from the mains.
It is necessary to keep the combustion chamber and the convection ducts of the boiler clean to save fuel. It is
necessary to clean walls and shelves in the combustion chamber through the cleaning and inspection doors.
Boiler exchanger and ash pan must be cleaned regularly.
Cleaning should be done with wire brushes on extension tubes. The above activities should be performed
during periodic boiler standstill, preferably every 100 hours of boiler operation. Thorough cleaning of the boiler
should be done once a month.
Instructions for disposal of the boiler at the end of its service life
(User)
Before scrapping the boiler, all electronic components must be disconnected from the boiler. They must be
disposed of in accordance with the European Directive 2002/96/EC concerning the disposal of electronic and
electrical equipment. For correct disposal, contact the manufacturer of the electronic components according to
the above mentioned European Directive.
The steel components of the boiler must be scrapped at designated scrap yards.
NOTE!
The used boiler, intended for scrapping, and its components must not be disposed of with
general waste.
Summary of Contents for GRAND PELLET 100
Page 1: ......
Page 2: ......
Page 10: ...METAL FACH Heating Technology 8 Boiler GRAND PELLET 15 34 ...
Page 12: ...METAL FACH Heating Technology 10 Boiler GRAND PELLET 50 150 ...
Page 42: ...METAL FACH Heating Technology 40 ...
Page 48: ...METAL FACH Heating Technology 46 ...
Page 50: ...METAL FACH Heating Technology 48 ...
Page 52: ...METAL FACH Heating Technology 50 ...
Page 59: ......
Page 60: ......